Last Updated | 03/24/2022 02:57 AM |
Project Title | Constructing a New Eastbound Port of Entry (POE) Facility on I-84 at MP 219 and Removing the Existing Cotterel POE |
Physical Address | View project details and contacts |
City, State (County) | ID (Cassia County) |
Category(s) | Heavy and Highway |
Sub-Category(s) | Paving/Reconstruction |
Contracting Method | Competitive Bids. |
Project Status | Results |
Bids Due | View project details and contacts |
Estimated Value | $10,000,000 to $15,000,000 |
Plans Available from | |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | For the work of constructing a new eastbound port of entry (POE) facility on I-84 at MP 219 and removing the existing Cotterel POE 105-010a Dispute Review Board-3 Member(Cont Item) 18,500.00 Ca 107-019a Monument Preservation 10,000.00 Ca 110-005a Training 1,430.00 Hr 201-005a Clearing & Grubbing 12.91 Acre 203-015a Rem of Bituminous Surf 6,427.00 Sy 203-050b Rem and Dispose Asbestos 10,000.00 Ca 203-055a Rem of Conc Pav 1,066.00 Sy 203-060a Rem of Conc Sidewalk 144.00 Sy 203-065a Rem of Curb 297.00 Ft 203-075a Rem of Fence 3,081.00 Ft 203-080a Rem of Guardrail/barrier 738.00 Ft 203-125a Rem of Miscellaneous Items 1.00 Ls 203-130a Removal of Pav Markings 5,245.00 Ft 203-135a Removal of Sign 25.00 Each 205-005a Excavation 22,728.00 Cy 205-005b Excavation Rock Removal 700.00 Cy 205-030a Borrow 3,107.00 Cy 205-040a Granular Borrow 133.00 Cy 205-060a Water for Dust Abatement 2,107.00 Mg 205-071a Excavation and Repair of Soft Spots 1,217.00 Cy 210-010a Str Excavation Sch No. 2 118.00 Cy 210-015a Compacting Backfill 39.50 Cy 212-011a Fiber Wattle 7,944.00 Ft 212-040a Berm 7,778.00 Ft 212-060a Stabilized Const Entrance 1.00 Each 212-095a Inlet Protection 1.00 Each 301-005a Granular Subbase 42,049.00 Ton 303-022a 3/4" Aggr Ty B for Base 25,435.00 Ton 307-006a Open-graded Base Class Ii 121.00 Cy 405-240a Misc Pav 2,320.00 Sy 405-410a Superpave Hma Pav Cl Sp-t 255.00 Ton 405-435a Superpave Hma Pav Incl Asph&add Cl Sp-3 4,253.00 Ton 405-455a Superpave Hma Pav Incl Asph&add Cl Sp-5 11,571.00 Ton 409-015a Conc Pav 400.00 Sy 420-015a Grind Concrete Pavement 400.00 Sy 602-035a 18" Pipe Culv 264.00 Ft 605-630a Inlet Ty 8 1.00 Each 605-635a Adjust Manhole Covers 5.00 Each 610-030a Fence Ty 3 B 3,195.00 Ft 612-005d W-beam Guardrail 1,595.00 Ft 612-110a Guardrail Anchor 2.00 Each 612-115b Guardrail Terminal, Flared 3.00 Each 612-120b Guardrail Transition, High Speed 1.00 Each 612-150a Concrete Barrier 1,889.00 Ft 612-155a Concrete Terminal Ty a 1.00 Each 613-015a Crash Cushion, Sacrificial-sand 3.00 Each 614-015a Sidewalk 111.00 Sy 614-025a Curb Ramp 12.40 Sy 615-492a Curb & Gutter Type 2 316.00 Ft 616-010a Signs Ty B 214.40 Sf 616-015a Signs Ty C 607.50 Sf 616-031a Overhead Cantilever Sign Structure 1.00 Each 616-035a Sign Brackets & Brace Angles 263.60 Lb 616-040a Brkawy Stl Sign Post Ty a 3,131.20 Lb 616-045a Brkawy Stl Sign Post Ty B 1,933.80 Lb 616-060a Brkawy Stl Sign Post Inst Ty a 20.00 Each 616-065a Brkawy Stl Sign Post Inst Ty B 19.00 Each 617-005a Delineator Ty 1 59.00 Each 617-045a Delineator Ty 9 32.00 Each 619-010a Illumination Ty 2 1.00 Ls 621-001a Seed 6.85 Acre 621-005a Seed Bed Preparation 6.85 Acre 621-010a Seeding 6.85 Acre 621-015a Mulching 6.85 Acre 621-020a Mulch Anchoring (Mechanical) 5.61 Acre 621-025a Mulch Anchoring (Tackifier) 1.24 Acre 621-035a Fertilizing 6.85 Acre 624-005a Loose Riprap 71.40 Cy 626-010a Temporary Traffic Control Signs 760.00 Sf 626-040a Barricade Ty 3 4.00 Each 626-050a Drums 75.00 Each 626-076a Arrow Board Ty C 1,500.00 Hr 626-100b Misc Temporary Traf Cont Items 2,500.00 Ca 626-105a Traf Cntl Maintenance 1,500.00 Hr 626-111a Temp Rigid Raised Pavement Markers 230.00 Each 626-116a Temp Concrete Barrier 4,475.00 Ft 626-117a R&r Temp Concrete Barrier 2,325.00 Ft 626-135a Weighted Base Tubular Markers 175.00 Each 630-025a Longitudinal Pav Mkg- Waterborne 52,136.00 Ft 631-010a Rumble Strips 0.23 Mile 640-010a Riprap/erosion Cont Geotextile 214.00 Sy 640-015a Subgrade Separation Geotextile 56,761.00 Sy 645-015a C4 Sp3 & Sp5 Field Lab 1.00 Ls 654-025a Compost 6.85 Acre 675-005a Survey 1.00 Ls 675-010a Directed Surveying Office Computations 5,000.00 Ca 675-015a Directed Surveying Crew 5,000.00 Ca 677-005a Record Drawings 1.00 Ls S501-15a Retaining Wall 6,087.00 Sf S901-05a Sp J-box Size C 26.00 Each S901-05b Sp J-box Size D 2.00 Each S901-05c Sp Rem & Reset Sign 1.00 Each S901-05d Sp Fusion Splice 20.00 Each S901-05e Sp Test Fiber 5.00 Each S901-05f Sp Fiber Termination 5.00 Each S901-05h Sp 4.5" Orifice Plate 1.00 Each S901-05i Sp Remote Display 1.00 Each S901-05j Sp Traffic Signal 2.00 Each S901-05m Sp Weigh-in-motion and Construction 1.00 Each S904-05a Sp Truck Containment Pad 1.00 Ls S904-05b Sp Poe Building 1.00 Ls S904-05c Sp Septic Sewer System 1.00 Ls S904-05d Sp Scale & Scale Pit 1.00 Ls S904-05f Sp Led Open Closed Sign 1.00 Ls S904-05g Sp Water System 1.00 Ls S911-05a Sp 2-inch Conduit 11,735.00 Ft S911-05f Sp Infiltraton Trench 5,225.00 Ft S911-05g Sp Fiber Optic Cable 594.00 Ft S911-05h Sp 18" Pipe Jacking 136.00 Ft S913-05a Sp Landscape Rock 18.64 Cy Z629-05a Mobilization 1.00 Ls |
||||||
Details |
|
||||||
Bidder's List | View project details and contacts | ||||||
Prospective Bidders | View project details and contacts | ||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |