Similar Projects
Water Storage Tank Rehabilitation
Results
Less than $1,120,820 est. value
Minnetonka, MN

Chattanooga Water Tower
Results
$700,000 est. value
Saint Charles, MN

Cope Avenue Tank Repairing and Painting
Results
Saint Paul, MN 55109

Water Tower Coatings
Results
$300,000 to $400,000 est. value
Fairmont, MN

Water Storage Tank Rehabilitation-Railway Street Elevated Tank
Results
Waldorf, MN 56091

2021 Cleaning, Repairing, Painting 1,500,000 Gallon Elevated Water Storage Tank, Tower Number One
Post-Bid
Golden Valley, MN

1 Million Gallon Composite Elevated Water Tower
Results
Le Sueur, MN

Otsego Water Tower 4
Results
$4,500,000 est. value
Otsego, MN

Regional Drinking Water Project Contract C - Elevated Water Tower
New Construction
Post-Bid
Cloquet, MN 55720

Northwest Tower Rehabilitation
Renovation
Results
Bloomington, MN

Commerce Court 1.0 MG Spheroid Water Tower Rehabilitation
Bidding
$1,000,000 est. value
Vadnais Heights, MN

250,000 Gallon Water Tower Rehabilitation
Bidding
Moose Lake, MN

Academy Street Tower & Morehouse Park Reservoir Repairs
Bidding
Owatonna, MN 55060

West 10MG Reservoir Rehabilitation
Bidding
Bloomington, MN 55420

Water Storage Tank Rehabilitation, 150,000-Gallon Spheroid WT No. 1
Bidding
Hoyt Lakes, MN

Last Updated 11/09/2020 11:18 AM
Project Title

Park Glen Road Water Tower Rehabilitation

Physical Address View project details and contacts
City, State (County) Saint Louis Park, MN 55416   (Hennepin County)
Category(s) Sewer and Water
Sub-Category(s) Storage/Water Tanks
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Cleaning, repairing and painting of an existing 1,000,000 gallon fluted column water tower including structural modifications, surface repairs, interior abrasive blast and coatings, and exterior blast and coating and containment. The project shall be bid to start on April 8, 2021, and be substantially completed by August 12, 2021, with a final completion date of September 30, 2021.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Reinforcing, Cast-in-Place Concrete.
Division 05 - Metals, Structural Metal Framing, Metal Decking.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Facility Fuel Piping, Facility Fuel-Storage Tanks.
Division 31 - Earthwork, Clearing and Grubbing, Grading.
Division 32 - Exterior Improvements, Fences and Gates.
Division 33 - Utilities, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents