Similar Projects
New High School Project - Contract No. 2 HVAC Construction
Bidding
$10,500,000 est. value
West Grove, PA

Rehabilitation of Building 19, Frick`s Lock Village Trailhead – Schuylkill River Trail - HVAC
Bidding
Pottstown, PA 19464

Utility Monitoring and Control Systems
Post-Bid
Less than $2,100,000,000 est. value

Removal Of Existing Dual Fired Boilers Installation New High Efficiency Boilers Downingtown West High School
Post-Bid
Downingtown, PA 19335

2018 Thickner Ventilation Repair Project
Results
Less than $230,000 est. value
Downingtown, PA

Brandywine Campus Alterations - HVAC
Results
$4,000,000 est. value
Downingtown, PA 19335

HVAC & Refrigeration Replacement / Maintenance
Term Contract
Post-Bid

Downingtown & Lionville Middle School Chiller Replacements
Results
$900,000 est. value
Downingtown, PA 19335

J--Cooler Tower Cleaning Coatesville VAMC
Post-Bid
Coatesville, PA 19320

Uwchlan Hills Elementary School - Contract No. 2 HVAC Construction
Results
$2,800,000 est. value
Downingtown, PA 19335

Multi-Purpose Room RTU Replacement at the East Goshen Elementary School Mechanical Contract
Post-Bid
Exton, PA 19341

Shamona Creek Boiler Replacements
Results
Downingtown, PA 19335

Chiller Plant Replacement at Owen J. Roberts High School
Post-Bid
Pottstown, PA 19464

HVAC Water Treatment System Maintanance 2019 - 2020
Term Contract
Results
Exton, PA

Z2DA--D/B Renovate SPS 542-21-206
Renovation
Post-Bid
$500,000 to $1,000,000 est. value
Coatesville, PA 19320

Last Updated 04/26/2019 08:45 AM
Project Title

Hillside Elementary School Air Conditioning Bid Package 3

Physical Address View project details and contacts
City, State (County) Wayne, PA 19087   (Chester County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description Bid Package # 3 Air Conditioning at Hillside Elementary School (Project # 18-031.03). The project consists of providing and installing new mechanical equipment in various locations at Hillside Elementary School for air conditioning of the existing building. Mechanical Construction contract includes new condensing units for existing unit ventilators, new roof top units with ductwork, new mini-split systems, new VRF systems and new HVAC web-based control systems. Electrical Construction contract includes new electrical service upgrade with new MDP, new power distribution for new electrical panels, branch circuit power for all new HVAC systems and new fire alarm systems. General Construction contract includes roof curbs, equipment supports, concrete pads with gates/fencing, and ceiling modifications for the running of ductwork.
Details
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.
Division 26 - Electrical.
Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents