Similar Projects
I-90/Hamilton St EB Off-Ramp - Bridge Deck Repair
Infrastructure, Renovation
Conception
$2,701,000 CJ est. value
Moses Lake, WA 98837

I-90/Hamilton St EB Off-Ramp - Bridge Deck Repair
Infrastructure, Renovation
Conception
$2,701,000 CJ est. value
Moses Lake, WA 98837

Priest Rapids Recreation Area Dredging and Bank Stabilization
Infrastructure
Design
$425,000 CJ est. value
Mattawa, WA 99349

I-90/SR 261 EB and WB Bridges - Structure Rehabilitation
Infrastructure, Renovation
Design
$5,169,000 CJ est. value
Moses Lake, WA 98837

RFQ - Sources Sought for Weed Control Throughout Central Oregon
Term Contract
Bidding
Grand Coulee, WA 99133

Larson Sedimentation Pond Rehabilitation
Infrastructure
Bidding
$80,000 CJ est. value
Moses Lake, WA 98837

Dodson Road Overlay
Infrastructure
Post-Bid
Ephrata, WA

SR 17 ET AL, NCR Seal 2022
Infrastructure
Post-Bid
$4,000,000 to $5,000,000 est. value

U-SE Road Overlay
Infrastructure
Results
$1,903,263 est. value
Ephrata, WA

Miscellaneous COF Upgrades
Infrastructure
Results
$470,000 est. value
Moses Lake, WA

8th Street and Selkirk Avenue Improvements
Infrastructure
Construction
$410,145 CJ est. value
Mattawa, WA 99349

8th Street and Selkirk Avenue Improvements
Infrastructure
Construction
$410,145 CJ est. value
Mattawa, WA 99349

Samaritan Hospital
New Construction, Infrastructure
Pending Verification
$136,000,000 CJ est. value
Moses Lake, WA 98837

Banks Lake Pumped Storage - Columbia Basin Hydropower
Infrastructure
Conception
$1,400,000,000 CJ est. value
Beverly, WA 99321

I-90/Wilson Creek Bridge WB - Deck Rehabilitation
Infrastructure, Renovation
Design
$946,000 CJ est. value
Moses Lake, WA 98837

Last Updated 01/06/2023 07:06 PM
Project Title

Milwaukee and Aerotec Water Mains

Physical Address View project details and contacts
City, State (County) Moses Lake, WA 98837   (Grant County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Maintenance, Paving/Reconstruction, Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected January 2023
Bids Due View project details and contacts
Estimated Value $447,313 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

**As of January 6, 2023, this project has been awarded to POW Contracting in the amount of $447,312.60. Project has been Rebid As of July 15, 2022, project will rebid sometime in the fall. This project consists of work at two separate work sites that will include installing approximately 1700 linear feet of 8 inch and 10 inch C900 PVC watermain, water main valves, tapping sleeves, roadway subgrade excavation, HMA patching, connecting to existing water mains, reconnecting existing water services, and traffic control..All bids shall be accompanied by a deposit in the form of a postal money order, cashiers check, or bond in an amount equal to 5 percent of the maximum total amount of the bid. Should the successful bidder fail to enter into a contract or furnish a satisfactory contract bond within the time stated in the specifications, the deposit shall be forfeited to the City. All bidders shall call 509-764-3786 prior to bid opening to sign up as a bidder on the project, whether or not they request a hard copy or obtain a digital copy of the Specifications. Bids received from bidders who are not signed in as a bidder on the project will be rejected for being non-responsive. Estimated Project Cost: $400,000 - $600,000.Contract Working Days: 75. The City Council reserves the right to reject any or all bids if such action is in the best interest of the City. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Details

Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents