Similar Projects
Downtown - Kirk Avenue 1 - 1068 - City of Roanoke
Alteration
Conception
$252,000 est. value
Roanoke, VA 24011

1400 - 1500 Block Main Street - 1003 - City of Roanoke
Infrastructure
Conception
$2,000,000 est. value
Roanoke, VA 24015

Regional Maintenance of Grease Trap Services for Hampton Roads Virginia AOR
Term Contract
Design

Sanitary Collection System Flow Monitoring Services
Term Contract
Post-Bid
Roanoke, VA

Contract for Ductile Iron Fittings
Infrastructure
Post-Bid
Roanoke, VA

Construction of the Richard Avenue 3200 Block Sewer Main Extension
Infrastructure
Results
Roanoke, VA 24012

Richard Avenue 3200 Block Sewer Extension
Infrastructure
Results
Roanoke, VA

Downtown - Campbell Avenue 2 - 1145 - City of Roanoke
Infrastructure
Conception
Less than $1,000,000 est. value
Roanoke, VA 24016

Contract for Miscellaneous Parts and Fittings
Term Contract
Post-Bid
Roanoke, VA

Construction of the Ore Branch Sanitary Sewer Replacement
Infrastructure
Results
Roanoke, VA 24014

4000 Block Virginia Avenue - 1081 - City of Roanoke
Infrastructure
Conception
Less than $700,000 est. value
Roanoke, VA 24017

Manhole Frame and Cover Replacement
Infrastructure
Post-Bid
$300,000 est. value
Roanoke, VA

Rivers Edge North Phase II Sanitary Sewer Improvements
Infrastructure
Results
Roanoke, VA 24016

900 Block Hunt Avenue - 1065 - City of Roanoke
Infrastructure
Conception
$620,000 est. value
Roanoke, VA 24012

Gravity Thickener Supernatant Drain Replacement - JRTP
Renovation, Infrastructure
Results
Newport News, VA 23602

Reported 07/11/2022 02:21 PM
Project Title

Melrose Avenue Crossing - 1000 - City of Roanoke

Physical Address View project details and contacts
City, State (County) Roanoke, VA 24017   (Roanoke City County)
Category(s) Sewer and Water
Sub-Category(s) Sanitary Sewers, Storm/Sewers
Contracting Method Competitive Bids.
Project Status Conceptual Design, Construction Start Expected March 2026
Bids Due View project details and contacts
Estimated Value $1,600,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

This project will replace existing undersized culverts (6 x 3 concrete box culverts under Melrose Avenue) that are inadequate for the 2-year event with 2@ 10 x 6 concrete box culverts. This project will also include improved channelization upstream and downstream of Melrose Avenue. The project limits are illustrated on the image below. The project extents are north and south of Melrose Avenue NW with the box culverts running across Melrose Avenue starting at the northeast edge of Forest Park Academy to the parking lot off Forest Park Blvd NW. This project is in included in the City of Roanoke FY 2023-2027 Capital Improvement Plan (CIP). As of July 08, 2022, further details regarding design and construction have not been identified. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Details

Division 03 - Concrete, Precast Concrete.
Division 33 - Utilities, Sanitary Sewerage Utilities, Sanitary Utility Sewerage Piping, Sanitary Utility Sewerage Force Mains, Sanitary Utility Sewerage Structures, Storm Drainage Utilities, Storm Utility Drainage Piping, Storm Utility Water Drains, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents