Similar Projects
Rehabilitation Taxiway B - City of La Crosse
Renovation, Infrastructure
Conception
$2,650,000 est. value
La Crosse, WI 54603

Reconstruct South Terminal Parking Lot - City of La Crosse
Infrastructure
Conception
$1,100,000 est. value
La Crosse, WI 54603

Coon Valley - Bangor, Dutch Creek Bridge, B-32-15
Infrastructure
Bidding
$750,000 CJ est. value
Bangor, WI 54614

Coon Valley - Bangor, Dutch Creek Bridge, B-32-15
Infrastructure
Bidding
$750,000 CJ est. value
Bangor, WI 54614

Annual Highway Materials
Term Contract
Post-Bid
West Salem, WI

2021 Water Utility Sidewalk Replacement
Post-Bid
La Crosse, WI

Lacrosse - Westby, Brickyard Lane to CTH M
Results
La Crosse, Westby, WI 54602

Airfield Paving Construction MATOC
Results
Less than $400,000,000 est. value

C. LaCrosse, South Avenue, Green Bay Street to Ward Avenue
Infrastructure
Bidding
$11,000,000 CJ est. value
La Crosse, WI 54601

20th and 21st Madison Street - Reconstruction
Post-Bid
La Crosse, WI 54601

2021 Curb and Gutter
Results
$50,000 est. value
La Crosse, WI 54601

Signal Fiber Northside Infill
Infrastructure
Bidding
$190,000 CJ est. value
La Crosse, WI 54601

2021 Curb and Gutter with Utilities
Post-Bid
La Crosse, WI 54603

2021 Carroll Field Improvements
Results
$210,000 est. value
La Crosse, WI

Sewer Replacements - Goddard and Usher Streets
Infrastructure
Bidding
$370,000 CJ est. value
La Crosse, WI 54601

Last Updated 07/29/2022 01:01 PM
Project Title

2202 - Parking Lot Repair and Maintenance

Physical Address View project details and contacts
City, State (County) La Crosse, WI 54601   (La Crosse County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction, Sidewalks/Parking Lot, Site Development
Contracting Method Competitive Bids
Project Status Construction start expected June 2022
Bids Due View project details and contacts
Estimated Value $287,736 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

As of July 27, 2022, this project has not yet been awarded. A timeline for award has not yet been established. The Contractor is required to provide a construction schedule for the work and abide by the schedule as agreed upon with the Western Technical College Facilities Department. The contractor is required to complete the work on a timely basis; once work starts, full work crews are to be provided daily. If the Contractor fails to complete service of any parking lot on a timely basis, the Contractor shall forfeit payment for the services not performed unless remedied to the satisfaction of Western Technical College. In the event of an emergency or failure by the Contractor to be able to adequately perform services, the Contractor must immediately contact the Facility Operations Manager at Western Technical College. The district reserves the right to reject any bid for due cause or to waive minor irregularities in any bid. All bids must be guaranteed for 60 days after the date of opening.

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents