Similar Projects
Kimball Avenue Shared Use Path (Phase 2) - City of South Burlington
Infrastructure, Alteration
Conception
$400,000 est. value
South Burlington, VT 05403

Kimball Avenue Shared Use Path (Phase 2) - City of South Burlington
Infrastructure, Alteration
Conception
$400,000 est. value
South Burlington, VT 05403

Wagner Wood Estates
New Construction
Design
Milton, VT

Chester GMRC(25)
Infrastructure
Design
$1,000,000 CJ est. value
Town of Rockingham, VT 05101

Northeast Regional Correctional Facility Paving Improvements
Infrastructure
Post-Bid
$61,680 est. value
Saint Johnsbury, VT 05819

North Troy Port Hardening
Infrastructure
Post-Bid
$1,000,000 CJ est. value
North Troy, VT 05859

Reclamation & Paving Project for Leno Lane, Kings Row, and North Branch Road
Infrastructure
Results
Middlebury, VT

Cady Road Reclamation & Paving Project
Infrastructure
Results
Middlebury, VT 05753

Main Street Mixed Use
New Construction - 29,778 SF
Construction
$2,692,240 est. value
Winooski, VT 05404

Twin City Motel Renovations/ New Construction Project
New Construction, Renovation, Demolition - 10,500 SF
Construction
$3,500,000 est. value
Berlin, VT

Tarrant Event Center - University of Vermont
Addition, Renovation, Infrastructure - 114,012 SF
Pending Verification
$95,000,000 CJ est. value
Burlington, VT 05405

New Chittenden Regional Correctional Facility - State of Vermont Buildings and General Services Division
New Construction, Infrastructure
Pending Verification
$62,000,000 CJ est. value
South Burlington, VT 05403

Airport Parkway (Phase 1) - City of South Burlington
Infrastructure
Conception
$563,000 est. value
South Burlington, VT 05403

Dorset Town Offices
New Construction, Infrastructure - 5,970 SF
Design
$3,600,000 CJ est. value
Dorset, VT 05251

Moore Lane Bridge Repair
Infrastructure
Post-Bid
$2,000,000 CJ est. value
Norwich, VT 05055

Last Updated 01/03/2024 09:04 AM
Project Title

Newport Crossing

Physical Address View project details and contacts
City, State (County) Newport, VT 05855   (Orleans County)
Category(s) Heavy and Highway, Residential
Sub-Category(s) Apartments/Condominiums, Paving/Reconstruction, Site Development
Contracting Method Bids by Invitation
Project Status Construction start expected May 2024 , Construction documents
Bids Due View project details and contacts
Estimated Value $18,000,000 [brand] Estimate
Plans Available from Selected Bidders
Owner View project details and contacts
Architect View project details and contacts
Description

As of January 3, 2024, this project is still working through Environmental Reviews. The owner hopes to have release from HUD by end of March 2024. A timeline for rebidding and construction has yet to be announced. Newport Crossing: 4 Properties - 119 Clermont Terrace, Newport, VT - Four Founders Circle - 329 Main Street, Newport, VT - 4116 VT Route 105, Newport Center, VT - and 4127 VT Route 105, Newport Center, VT 119 Clermont Terrace - consists of the existing historic gut renovation and a new addition totaling 26 apartment units. 4116 VT Route 105 - consists of a renovation of townhome style units and a new ADA unit totaling 8 units. 4127 VT Route 105- consists of demolishing an existing building to make way for 3 new townhouse style units with new basement and public area. 329 Main Street - consists of a renovation to 3 units

Details

Division 03 - Concrete, Concrete Forming and Accessories, Precast Concrete, Site-Cast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Architectural Woodwork, Architectural Wood Casework.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Wood Doors, Plastic Doors, Windows, Hardware, Glazing, Louvers and Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Carpeting, Painting and Coating.
Division 10 - Specialties, Toilet, Bath, and Laundry Accessories.
Division 11 - Equipment, Residential Equipment, Residential Appliances.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Residential Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting.
Division 27 - Communications, Structured Cabling.
Division 31 - Earthwork, Grading, Excavation and Fill, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents