Similar Projects
Brown Intermediate & Polson Middle Courtyard/Entry/Main Office
New Construction, Renovation
Design
Madison, CT 06443

Design/Build Locker Rooms
Post-Bid
West Haven, CT

Owner`s Construction Representative Services for Expansion and Alterations of Hamden Middle School
Renovation, Addition
Post-Bid
Hamden, CT 06518

Owner`s Representative for a School Modernization Plan
Results
Cheshire, CT

Main Entryway Improvements
Renovation
Results
$953,500 est. value
Cheshire, CT 06410

Additions and Renovations to Platt Technical High School
New Construction, Renovation, Addition - 210,000 SF
Construction
$83,153,472 est. value
Milford, CT

Platt Tech
New Construction - 237,000 SF
Construction
$92,000,000 est. value
Milford, CT

East Haven High School LMC Workspace Renovation
Renovation
Post-Bid
East Haven, CT

Disaster Recovery Services
Results

OPS Locker Room Storage Project - Fire Code and Construction
Renovation
Post-Bid
Oxford, CT 06478

Construction Management at Risk Services for the Pre-Construction and Construction Project of Hamden Middle School
Results
Hamden, CT 06518

Soundproof Wall Construction for Manufacturing Workshop
Renovation
Post-Bid
East Haven, CT 06513

Entrance Upgrades at Joseph Foran High School
Renovation
Results
Milford, CT 06460

Entrance Upgrades at East Shore Middle School
Renovation
Results
Milford, CT 06460

New High School
New Construction - 106,100 SF
Results
$56,900,000 to $66,242,390 est. value
North Branford, CT 06471

Reported 11/18/2021 12:00 AM
Project Title

North Branford High School Phase II

Physical Address View project details and contacts
City, State (County) North Branford, CT 06471   (New Haven County)
Category(s) Education
Sub-Category(s) Middle/Senior High School
Contracting Method Competitive Bids.
Project Status Sub-Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Demolition of the existing 124,000 SF North Branford High School in its entirety and replacing it with a new 108,750 SF building at the same site. The new High School will be constructed in two phases. Phase I to include constructing a threestory building that will house Academic Spaces, Science Rooms, Admin. Offices, Kitchen, Cafeteria, stairs, Mechanical Rooms, Electrical rooms, Bathrooms and other support spaces. Phase II will include a twostory building that will house Academic Spaces, Gymnasium, LockerRooms, Art classrooms and other support spaces. The site improvement consists of new parking lots, grading, practice field, lighting, new utilities, new driveways, landscaping and striping. The work has been divided into the following bid packages: 04A Masonry 05B Misc. Metals 06A Millwork 07A Roofing 07B Metal Panels Metal Siding 08A Glass & Glazing Doors and Windows 08B Doors Frames & Hardware 09A Drywall & General Trades Drywall & Acoustical 09B Acoustical Ceilings 09C Tile 09D Flooring 09E Carpet 09F Painting 10A Toilet Compartments 10B Signage 10C Metal Lockers 11A Kitchen Equipment 11B Gym Equipment 12A Lab Casework 12B Window Treatments 14A Elevator 21A Fire Protection Fire Protection Sprinkler System 22A Plumbing Plumbing 23A HVAC 26B Electrical 27A Tele Data 27B Audio Visual 28A Security 31A Sitework 32A Site Concrete 32B Landscaping

Details

1 Middle/Senior High School, 124,000 SF New Construction.
Division 03 - Concrete, Cast-in-Place Concrete.
Division 27 - Communications, Common Work Results for Communications.
Division 28 - Electronic Safety and Security, Common Work Results for Electronic Safety and Security.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Irrigation, Planting Irrigation, Planting, Planting Preparation, Soil Preparation, Landscape Grading.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents