Similar Projects
Intersection Improvement US 176 (State Rd)/S-135 (Mudville Rd)
Infrastructure
Conception
$2,100,000 CJ est. value
Ridgeville, SC 29472

Intersection Improvement US 401 (N Darlington Hwy)/SC 341
Infrastructure
Conception
$2,100,000 CJ est. value
Lynchburg, SC 29080

East Coast Greenway - River Oaks Dr / Frontage Rd B-2
Infrastructure
Design
$25,650 CJ est. value
Myrtle Beach, SC 29579

Crane Creek 02 and 04 SSES and Rehabilitation Implementation
Infrastructure
Design
$700,000 CJ est. value
Columbia, SC 29201

Rehabilitation Berkeley County
Infrastructure
Bidding
$8,547,797 CJ est. value
Moncks Corner, SC 29461

Widening - SC 126 - Aiken County
Infrastructure
Bidding
$12,000,000 CJ est. value
Clearwater, SC 29841

RFQ - United States Coast Guard (USCG) Disaster Reconstitution Multiple Award Construction Contract
Term Contract
Post-Bid
$1,500,000 CJ est. value
Seattle, WA 98174

RFQ - United States Coast Guard (USCG) Disaster Reconstitution Multiple Award Construction Contract
Term Contract
Post-Bid
$1,500,000 CJ est. value
Seattle, WA 98174

NMB Ocean Drive Street End Landscaping
Infrastructure
Results
North Myrtle Beach, SC 29582

Lancaster County Airport Terminal Building and Lighting Vault - Bid Schedules A, B, & E
New Construction, Infrastructure
Results
$4,737,926 CJ est. value
Lancaster, SC 29720

Okatie Retail Center
New Construction, Infrastructure - 9,911 SF
Pending Verification
$3,000,000 CJ est. value
Okatie, SC 29909

Land Use Plans for the US 278 Corridor Improvement Project
Infrastructure
Pending Verification
$4,000,000 CJ est. value
Hilton Head Island, SC 29926

Riverwood Drive and Old Kings Hwy
Infrastructure
Conception
$4,545,000 CJ est. value
Murrells Inlet, SC 29576

Culvert Installation and Road Paving at Century Park
Infrastructure
Design
$265,000 CJ est. value
Greer, SC 29650

Street Sweeping-Colleton
Term Contract
Post-Bid
Columbia, SC

Last Updated 11/10/2022 12:38 PM
Project Title

Enhancement - US 15 (Lee Co)

Physical Address View project details and contacts
City, State (County) Bishopville, SC 29010   (Lee County)
Category(s) Heavy and Highway
Sub-Category(s) Maintenance, Paving/Reconstruction, Site Development
Contracting Method Bids by Invitation, Competitive Bids
Project Status Results, Construction start expected January 2023
Bids Due View project details and contacts
Estimated Value $578,777 [brand] Estimate
Plans Available from Civil Engineer - 10/11/22
Owner View project details and contacts
Architect View project details and contacts
Description

SC File NO(S).: 3157970 PCN: P039860 Project No.: P039860 DBE Goal Percent: 17.50% Approx. Length (miles):0.6880 CO(S).: : Lee The Contractor's attention is called to the requirements of the SC Department of Transportation for Prequalification. Only contractors who have been issued a prequalification certificate by the sc department of transportation will be allowed to submit bids. Information concerning prequalification can be obtained at the Contracts Administration office, Room 332 in the Headquarters building, 955 Park Street, Columbia, SC, or by contacting Maria Devito at (803)737-2043 or Prequal@scdot.org. Unless otherwise indicated in the advertisement, no proposal will be considered unless accompanied by a bid bond in the amount of 5% of the Approximate bid amount, written by a surety satisfactory to the Department, properly executed in South Carolina Department of Transportation Form 674 (furnished by the Department in each proposal). If an electronic bond is utilized, the Bond ID number must be provided on the Surety 2000 or SurePath Network electronic bond form. No other form of proposal guaranty will be accepted. Visitors are welcome and should sign in at the Park Street entrance. Please contact the Contract Administration Office at (803)737-1249 with all Letting related questions. The south carolina department of transportation reserves the right to reject any or all proposals and waive any technicalities. SCDOT - 220 - Enhancement - US 15 (Lee Co) - concrete sidewalk, hot mix asphalt DBE (17.5%), MBE (32.0%), WBE (6.9%), Completion Date for this project is June 30, 2023.

Details

Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents