Similar Projects
SMORE Trail Part II- Division Creek - C.8 - City of Big Bear Lake
Renovation, Alteration
Conception
$500,000 est. value
Big Bear City, CA 92314

Rathbun Creek Trail Phase 3 - C.5 - City of Big Bear Lake
Infrastructure
Conception
$1,591,600 est. value
Big Bear Lake, CA 92314

Cape Seal Project (Measure N)
Term Contract
Design
Visalia, CA

Redlands Mall Development
New Construction, Renovation - 84,106 SF
Design
$275,000,000 est. value
Redlands, CA 92373

Olympic View Drive - Skyview Ridge Pavement Rehabilitation Project
Infrastructure
Bidding
$520,000 est. value
Chino Hills, CA

Imported Borrow, Shoulder Backing, and Structural Concrete
Infrastructure
Bidding
$12,000,000 est. value
San Bernardino, CA 92405

Storm Drain Improvements
Infrastructure
Post-Bid
Chino, CA 91709

Laurel Avenue at Randall Avenue
Alteration
Post-Bid
Fontana, CA 92331

Replace Pcc and Ac Pavement With Jpcp and Hma Pavement
Infrastructure
Results
CA

Saw Cutting, Asphalt Repair/Replacement, Slurry, and Paving
Infrastructure
Results
Yucaipa, CA 92399

Rathbun Creek Trailhead Restroom and Parking Lot - City of Big Bear Lake
Infrastructure
Conception
$660,000 est. value
Big Bear Lake, CA

Pumalo Street Townhomes
New Construction, Infrastructure
Design
$4,500,000 est. value
San Bernardino, CA 92404

Woodview Road Pavement Rehabilitation Project
Infrastructure
Bidding
$265,000 est. value
Chino Hills, CA 91709

Traffic Signalization, Street Light And Signing & Striping Improvements
Infrastructure
Post-Bid
$828,757 est. value
Ontario, CA 91761

Seventh Avenue Arrowhead Drive Road Improvement
Alteration
Results
Victorville, CA

Last Updated 07/08/2022 09:20 AM
Project Title

9/11 Memorial Monument Project

Physical Address View project details and contacts
City, State (County) Fontana, CA 92335   (San Bernardino County)
Category(s) Heavy and Highway, Single Trades
Sub-Category(s) Monument/Sculpture, Paving/Reconstruction, Site Development
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $965,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The general items of work to be done here under consist of the construction of a monument at an existing traffic circle/water fountain incorporating a 18' long beam from the World Trade Center debris. Project will include the construction of landscape improvements, steel structures, lighting, irrigation, electrical, drainage, restoring all improvements (paving, striping, sidewalk, landscape, etc.) to pre-construction conditions and all work required as indicated on the project plans.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 02 - Existing Conditions, Subsurface Investigation.
Division 26 - Electrical, Exterior Lighting.
Division 31 - Earthwork, Grading, Earthwork Methods.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents