Similar Projects
Kid's Kottage 2 - Metal Roof Replacement Project
Renovation
Sub-Bidding
$325,000 CJ est. value
Reno, NV 89502

MZ3 Replacement Project
Renovation
Sub-Bidding
$240,000 CJ est. value
Reno, NV 89502

Hangar F Roof Coating
Alteration
Post-Bid
$47,000 est. value
Reno, NV 89502

Roof Replacement on Mobile Classroom Buildings at Smithridge Elementary School and North Valleys High School
Alteration
Post-Bid
$125,000 est. value
Reno, NV 89502

Federal Inspection Services Facility Roof Replacement Project
Results
Reno, NV 89502

Fire Station 3 - Roof Replacement
Alteration
Results
$115,000 est. value
Reno, NV

Kid's Kottage 2 Roof Replacement Project
Renovation
Sub-Bidding
$325,000 CJ est. value
Reno, NV 89502

Reno-Sparks Convention Center Sections D3 and U1 Roof Refurbishment
Alteration
Post-Bid
$1,000,000 est. value
Reno, NV 89502

Fire Station 4 - Roof Repair
Alteration
Results
$100,000 est. value
Reno, NV 89503

District-Wide Emergency Roof Repair and Roof Maintenance Repair Services
Term Contract
Post-Bid
Reno, NV 89501

Paradise Park Community Center - Roof and Siding Replacement
Alteration
Results
$110,000 est. value
Reno, NV 89512

Replace Roofs at Agricultural Education Building and Renewable Resource Center
Renovation
Post-Bid
$694,000 CJ est. value
Reno, NV 89501

Roof Replacement at Lloyd Diedrichsen Elementary School
Alteration
Results
$274,000 est. value
Sparks, NV 89434

Unr - Design and Replace Roof at Cashell Fieldhouse/Sports Medicine Complex
Term Contract
Results
$350,000 to $450,000 est. value
Reno, NV 89557

Roof Replacement at Spanish Springs High School
Alteration
Results
$1,962,000 est. value
Sparks, NV 89441

Last Updated 11/16/2022 03:37 PM
Project Title

WC Admin Building B Roof Restoration Project

Physical Address View project details and contacts
City, State (County) Reno, NV 89512   (Washoe County)
Category(s) Single Trades
Sub-Category(s) Roofing
Contracting Method Competitive Bids
Project Status Results, Construction start expected April 2023
Bids Due View project details and contacts
Estimated Value $48,000 [brand] Estimate
Plans Available from County Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Building B Roofing Restoration Installation Bid Deadline For Submitting Questions 04-Nov-2022 12:00 PM PST Restoration of existing roofing with Owner Supplied Fluid Applied Restoration system per included specifications. Completion Bond-100% 1. Properly clean entire roof system per specification, clean off all loose minerals. 2. Cut out all blisters and any wet foam, install new foam, insure a level surface. 3. Repair all defects in roof system per manufacturers specification and NRCA standards, three-course with LiquiTec and reinforcement fabric. 3 gals/sq. embed fabric, then apply another 2 gals/sq. on top 4. Prime any asphalt mastic (within one year old) with Garla-Block per manufacturers specification. 5. Remove any existing walk pads 6. Contractor to install Tuff-Stuff caulking to all coping seams. 7. Install polyester reinforcement fabric to all ponding water areas per manufacturers specification. 3 gals/sq., embed fabric, then apply another 2 gals/sq. on top, allow to cure. 8. Properly reattach all loose fasteners on any metal coping cap system. Replace any missing fasteners with slightly large that have a neoprene washer 9. Remove all dried-out caulking at any term bar or counter flashing, install all new Tuff-Stuff caulking. 10. Coordinate with Owner to shut down and cover all HVAC units with visqueen to prevent any odors from entering building. 11. Remove any dried coating, asphalt, etc. on any HVAC pans, coat any HVAC pans with LiquiTec at 2 gals/square. 12. Refill any pitch pockets with Seal-Tite sealant. 13. Coat up all parapet walls with LiquiTec 14. Coat any HVAC duct seams with LiquiTec coat @ 2 gals/sq. 15. Repair all internal drains, replace all missing bolts, retorque all bolts, verify proper seal, etc. 16. Apply a coat of LiquiTec base coat at 1 1/2 gal/sq. over entire roof system per manufacturers specification. Contractor must roll product, spraying this product is not allowed. Allow to fully cure 17. Apply a second coat of LiquiTec at 1 gal/sq. over the entire roof system per manufacturers specifications. 18. Contractor to apply sealant to existing skylights per manufactures guidelines. 19. Contractor to protect adjacent areas, and clean all drips and spills. 20. Contractor is responsible for receiving, storage and hoisting of all material 21. Contractor to install the owner supplied material. Any material or accessories required for the installation of the roof system is excess of the County provided material must be supplied by the Contractor. It is up to the contractor to determine the precise amount of material required for the completion of this project; and to provide excess material, as required. 22. Manufacturers Rep to provide job site inspections. 23. Contractor is responsible to "field measure" the entire roof system, the owner is NOT responsible for any errors on the provided drawings.

Details

Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents