Similar Projects
Honors College - Modesto Maidique Campus - Florida International University
New Construction, Infrastructure - 78,000 SF
Conception
$25,745,334 CJ est. value
Miami, FL 33174

Science Laboratory Complex - Modesto Maidique Campus - Florida International University
New Construction, Infrastructure - 124,462 SF
Conception
$93,130,000 CJ est. value
Miami, FL 33194

Wastewater Pump Station Improvements
Design
North Bay Village, FL

NW North River Drive Multifamily
Demolition, New Construction, Infrastructure - 6,800 SF
Design
$50,000,000 CJ est. value
Miami, FL 33136

DB MATOC - Corrosion Facility/Wash Rack
New Construction, Infrastructure - 19,500 SF
Bidding
$25,000,000 CJ est. value
Homestead, FL 33039

Maurice Gibb Memorial Park
Infrastructure, Renovation
Bidding
$4,000,000 CJ est. value
Miami Beach, FL 33139

Publix #1770 - Riviera Plaza / Coral Gables
New Construction, Infrastructure - 52,363 SF
Post-Bid
$10,000,000 CJ est. value
Coral Gables, FL 33146

Emergency Response for Pumping Operations
Infrastructure
Post-Bid
$55,140 est. value
FL

Racetrack Water Tower Booster Pump Station
New Construction
Results
$750,000 est. value
Homestead, FL 33035

Comprehensive Everglades Restoration Plan, Biscayne Bay Coastal Wetlands, L-31E Flow-Way, Contract 5C (A Phase I Project): Pump Stations S-710 And S-711; Seepage Canal C-711W; Miami-Dade County, Florida
New Construction
Results
$15,000,000 to $25,000,000 est. value
Miami, FL

Uni Tower Mixed Use / Miami
New Construction, Infrastructure - 38,000 SF
Construction
$43,000,000 CJ est. value
Miami, FL 33132

Gateway Commerce Park - Phase 2
New Construction
Construction
Miami Gardens, FL

Beckham's Miami Freedom Park - United Major League Soccer Stadium
New Construction, Infrastructure - 1,000,000 SF
Pending Verification
$1,000,000,000 CJ est. value
Miami, FL 33125

Ponce Park Tower
New Construction, Infrastructure - 15,671 SF
Pending Verification
$34,000,000 CJ est. value
Coral Gables, FL 33145

Academic Health Center Study Complex - A20 - Florida International University
New Construction, Infrastructure - 33,133 SF
Conception
$41,600,000 CJ est. value
Miami, FL 33174

Last Updated 08/24/2022 03:31 PM
Project Title

Biscayne Bay Coastal Wetlands - Cutler Flow Way Phase 1, Pump Station S-701

Physical Address View project details and contacts
City, State (County) Homestead, FL 33030   (Miami-Dade County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Lift and Pump Stations, Site Development
Contracting Method Competitive Bids
Project Status Construction start expected October 2022
Bids Due View project details and contacts
Estimated Value $3,000,000 [brand] Estimate
Plans Available from State Agency
Owner View project details and contacts
Architect View project details and contacts
Description

The construction of the new pump S-701 station will have three (3) 100-cfs and two (2) 50-cfs electric-motor-driven pumps, for a total pumping capacity of 400 cfs. Work includes construction of a pump station intake canal and portion of a discharge canal.

Details

Division 03 - Concrete.
Division 04 - Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection.
Division 08 - Openings.
Division 09 - Finishes.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Extinguishers, Storage Specialties.
Division 11 - Equipment.
Division 12 - Furnishings.
Division 14 - Conveying Equipment, Scaffolding.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.
Division 27 - Communications, Data Communications, Voice Communications, Audio-Video Systems.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork.
Division 32 - Exterior Improvements, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains.
Division 40 - Process Integration, Water Process Piping.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents