Similar Projects
South Commercial Avenue Corridor Plan - Phase II Commercial Avenue from 14th to 34th - City of Anacortes
Infrastructure
Conception
$60,000,000 CJ est. value
Anacortes, WA 98221

Fidalgo Bay Road Reconstruction - City of Anacortes
Infrastructure
Conception
$9,500,000 CJ est. value
Anacortes, WA 98221

SR 20/Unnamed Tributary to Red Creek - Fish Passage
Infrastructure
Design
$6,640,000 CJ est. value
Concrete, WA 98237

SR 20/Unnamed Tributary to Red Creek - Fish Passage
Infrastructure
Design
$6,640,000 CJ est. value
Concrete, WA 98237

Little Mountain Sky Ridge Road Pipeline Project
Infrastructure
Bidding
$500,000 CJ est. value
Mount Vernon, WA 98274

Darrington Wood Innovation Center
Infrastructure
Post-Bid
$9,650,000 est. value
Darrington, WA

Western Washington University Electrical Engineering & Computer Science Building
Term Contract
Post-Bid

Tower Site Readiness Phase III Project
Infrastructure
Results
Arlington, Bothell, Darrington, Everett, Monroe, WA 98241

I-405, NE 85th Street Interchange and Inline BRT Station Project
Infrastructure
Results
$228,286,585 CJ est. value
Kirkland, WA 98033

17th Street Q Avenue Intersection - City of Anacortes
Infrastructure
Conception
$2,000,000 CJ est. value
Anacortes, WA 98221

I-5 / Maddox Creek - Fish Passage
Infrastructure
Design
$15,457,000 CJ est. value
Mount Vernon, WA 98273

Stewart Field New Restroom Building
New Construction, Infrastructure - 2,385 SF
Post-Bid
Aberdeen, WA 98520

SR 534/Unnamed Tributary to Carpenter Creek - Fish Passage
Infrastructure
Results
$3,468,767 CJ est. value
Mount Vernon, WA 98274

SR 20 Spur (Oakes Ave) Sidewalk Improvements - City of Anacortes
Infrastructure
Conception
$1,000,000 CJ est. value
Anacortes, WA 98221

The Crossings Cottages Development
New Construction, Infrastructure
Design
$800,000 CJ est. value
Anacortes, WA 98221

Last Updated 12/13/2022 02:02 AM
Project Title

RFQ D/B - SR 20/Olson Creek and Unnamed Tributary to Skagit River - Fish Passage

Physical Address View project details and contacts
City, State (County) Concrete, WA 98237   (Skagit County)
Category(s) Heavy and Highway
Sub-Category(s) Dock/Pier/Marine, Site Development
Contracting Method Competitive Bids
Project Status Contract Award, Request for Qualifications, Construction start expected December 2022
Bids Due View project details and contacts
Estimated Value $22,785,985 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

This project, will replace the existing fish barrier culvert crossings on SR 20 at. Unnamed. Tributary to Skagit. River (MP 94.82, WDFW Site 991126) and SR 20 at Olson Creek (MP 105.42, WDFW Site CD18) with fish passable water crossing structures. The Project, will. include the fol-lowing: Providing water crossing and structure designs, plans, and specifications for the project. Providing design documenta-tion. Providing hydraulic design documentation, Providing stream restoration in th.e immediate vicinity of the crossings, as required. Acquiring environmental permits as an authorized agent of WSDOT. Providing mitigation solutions for sensitive area impacts. Facilitating temporary and permanent utility adjustment and relocation. Other elements including but not. limited to embankment, grading, paving, storm drainage, guardrail, signing, erosion con-trol, and planting. Engineer's Estimate: The esti-mated Contract cost of the proj-ect is approximately $15 to $20 Million. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. Prequa.lification: Maximum Bidding Capacity in the amount of $20 Million or higher and the Submitter or at least one Major *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. Time for Completion 24 WSDOT anticipates that the Project will be Substantially Complete by ***December 25 31, 2024*** A DBE Goal in the amount of ***16*** percent for the design portion and ***21*** percent for the construction portion of the Contract Price has been established.

Details

Division 35 - Waterway and Marine Construction, Common Work Results for Waterway and Marine Construction, Waterway and Marine Construction and Equipment, Marine Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents