Similar Projects
Last Updated | 12/13/2022 02:02 AM |
Project Title | RFQ D/B - SR 20/Olson Creek and Unnamed Tributary to Skagit River - Fish Passage |
Physical Address | View project details and contacts |
City, State (County) | Concrete, WA 98237 (Skagit County) |
Category(s) | Heavy and Highway |
Sub-Category(s) | Dock/Pier/Marine, Site Development |
Contracting Method | Competitive Bids |
Project Status | Contract Award, Request for Qualifications, Construction start expected December 2022 |
Bids Due | View project details and contacts |
Estimated Value | $22,785,985 [brand] Estimate |
Plans Available from | Agency's Affiliate |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | This project, will replace the existing fish barrier culvert crossings on SR 20 at. Unnamed. Tributary to Skagit. River (MP 94.82, WDFW Site 991126) and SR 20 at Olson Creek (MP 105.42, WDFW Site CD18) with fish passable water crossing structures. The Project, will. include the fol-lowing: Providing water crossing and structure designs, plans, and specifications for the project. Providing design documenta-tion. Providing hydraulic design documentation, Providing stream restoration in th.e immediate vicinity of the crossings, as required. Acquiring environmental permits as an authorized agent of WSDOT. Providing mitigation solutions for sensitive area impacts. Facilitating temporary and permanent utility adjustment and relocation. Other elements including but not. limited to embankment, grading, paving, storm drainage, guardrail, signing, erosion con-trol, and planting. Engineer's Estimate: The esti-mated Contract cost of the proj-ect is approximately $15 to $20 Million. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. Prequa.lification: Maximum Bidding Capacity in the amount of $20 Million or higher and the Submitter or at least one Major *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. Time for Completion 24 WSDOT anticipates that the Project will be Substantially Complete by ***December 25 31, 2024*** A DBE Goal in the amount of ***16*** percent for the design portion and ***21*** percent for the construction portion of the Contract Price has been established. |
||
Details |
|
||
Bidder's List | View project details and contacts | ||
Prospective Bidders | View project details and contacts | ||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |