Similar Projects
Water Line Replacement - Del Robles/Foothill/Camino - CP76300037 - City of Simi Valley
Infrastructure
Conception
$730,000 est. value
Simi Valley, CA

Water Line Replacement - Hilltop Road / Oak Knolls - CP76300036 - City of Simi Valley
Alteration
Conception
$550,000 est. value
Santa Susana, CA 93063

AutoZone #6032 / Oak View
New Construction, Infrastructure - 6,500 SF
Design
$1,500,000 CJ est. value
Ventura, CA 93001

AutoZone #6032 / Oak View
New Construction, Infrastructure - 6,500 SF
Design
$1,500,000 CJ est. value
Ventura, CA 93001

Traffic Signal Improvements at Las Posas and Temple
Infrastructure
Bidding
$600,000 CJ est. value
Camarillo, CA 93010

Traffic Signal Improvements at Las Posas and Temple
Infrastructure
Bidding
$600,000 CJ est. value
Camarillo, CA 93010

Manila Highway 255 Shared Use Path
Alteration
Post-Bid
$888,055 est. value

Rebuild Paramount Ranch & Rocky Oaks Administrative Area, Santa Monica Mountain
Renovation, Infrastructure - 20,060 SF
Post-Bid
$10,000,000 CJ est. value
Thousand Oaks, CA 91362

Hydronic Valve Replacement
Infrastructure
Results
Channel Islands Beach, CA

Street Lights, Traffic Signals and Damaged Concrete Replacement
Infrastructure
Results

Trojan Storage / Camarillo
New Construction, Infrastructure - 116,364 SF
Construction
$12,500,000 CJ est. value
Camarillo, CA 93010

Trojan Storage / Camarillo
New Construction, Infrastructure - 116,364 SF
Construction
$12,500,000 CJ est. value
Camarillo, CA 93010

Wendy Drive Mixed-Use Development
New Construction, Infrastructure - 11,790 SF
Pending Verification
$2,500,000 CJ est. value
Thousand Oaks, CA 91320

Wendy Drive Mixed-Use Development
New Construction, Infrastructure - 11,790 SF
Pending Verification
$2,500,000 CJ est. value
Thousand Oaks, CA 91320

Arroyo Drive Railroad Crossing Improvement
Alteration
Conception
$1,000,000 est. value
Moorpark, CA 93021

Last Updated 11/23/2022 01:33 PM
Project Title

Rancho Conejo Boulevard

Physical Address View project details and contacts
City, State (County) Thousand Oaks, CA 91320   (Ventura County)
Category(s) Heavy and Highway, Industrial/Manufacturing, Sewer and Water
Sub-Category(s) Manufacturing/Processing Plant, Paving/Reconstruction, Sidewalks/Parking Lot, Site Development, Water Lines
Contracting Method Bids by Invitation
Project Status Construction start expected April 2023
Bids Due View project details and contacts
Estimated Value $2,000,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

As of November 23, 2022, this project received plan approval. Information regarding the general contractor and construction timeline is not known. This project is to demolish 5,600 square feet of existing industrial building and construct a 7,700 square foot addition, including an interior and exterior remodel, hardscape, drainage, parking lot improvements, and removal and replacement of existing landscaping to accommodate proposed building modifications, site improvements, and onsite bio-retention basins. *Project information, including timeline and contacts, has been obtained through public sources. The content management team continues to pursue additional details; however, the contact(s) listed have yet to disclose or confirm any information. Inquiries should be directed to the contact(s) listed.

Details

7,700 SF - 7,700 SF. 5,600 SF.
Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Reinforcing, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Specialty Doors and Frames, Windows, Hardware.
Division 09 - Finishes, Flooring, Painting and Coating.
Division 10 - Specialties, Signage, Compartments and Cubicles, Emergency Aid Specialties, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Storage Specialties, Lockers.
Division 11 - Equipment, Laboratory Equipment.
Division 12 - Furnishings.
Division 13 - Special Construction.
Division 14 - Conveying Equipment.
Division 21 - Fire Suppression, Fire-Extinguishing Systems.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 25 - Integrated Automation.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Audio-Video Communications.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Video Surveillance, Fire Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Grading, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Sanitary Sewerage Utilities, Storm Drainage Utilities.
Division 40 - Process Integration, Water Process Piping, Pneumatic Conveying Lines, Instrumentation and Control for Process Systems.
Division 41 - Material Processing and Handling Equipment, Bulk Material Processing Equipment, Bulk Material Conveying Equipment, Bulk Material Feeders, Batching Equipment, Conveyors, Cranes and Hoists, Specialty Material Handling Equipment, Manufacturing Equipment, Manufacturing Lines and Equipment, Container Processing and Packaging.
Division 44 - Pollution and Waste Control Equipment, Air Pollution Control, Odor Control, Water Pollution Control Equipment, Water Pollution Containment and Cleanup Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents