Similar Projects
Upper Walnut Creek Sanitary Sewer Improvements
Infrastructure
Bidding
Raleigh, NC 27610

Maintenance on Sewer and Backflow Preventers
Term Contract
Post-Bid
Raleigh, NC 27699

Terrible Creek WWTP Vacuum Truck Unloading Station Project
Post-Bid
Fuquay-Varina, NC

Crabtree Creek and West Neuse Interceptor Rehabilitation
Results
Less than $12,000,000 est. value
Raleigh, NC 27601

Grease Trap Pumping
Term Contract
Results
Raleigh, NC 27610

Lenoir Street Sewer Relocation
Post-Bid
Less than $70,000 est. value
Raleigh, NC 27601

Septic Tank Remediation
Term Contract
Results
Raleigh, NC 27610

Harris Creek Sewer
Post-Bid
Raleigh, NC 27604

Brentwood Estates Sewer Improvements
Results
$3,200,000 to $3,600,000 est. value
Raleigh, NC 27601

Neuse River East Parallel Interceptor
Post-Bid
$75,000,000 to $85,000,000 est. value
Raleigh, NC

Force Main Replacement for Avent Ferry Pump Station
Results
Less than $2,562,602 est. value
Holly Springs, NC 27540

Hydrant On-Call Replacement 2021 Contract (Rfq)
Post-Bid
Raleigh, NC

Harris Creek Sanitary Sewer Replacement
Results
Raleigh, NC

Upper Pigeon House and Five Points Water and Sewer Replacement
Post-Bid
Raleigh, NC

Peace Street Utility Improvements
Results
Less than $629,473 est. value
Raleigh, NC 27601

Last Updated 10/07/2021 08:25 AM
Project Title

West Neuse Interceptor, Upper Walnut Creek Interceptor and Neuse River East Parallel Interceptor

Physical Address View project details and contacts
City, State (County) Raleigh, NC   (Wake County)
Category(s) Sewer and Water
Sub-Category(s) Sanitary Sewers
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Location 1 West Neuse Interceptor Improvements: This project involves the construction of approximately 25,400 LF of 66- and 60-inch sanitary sewer pipe along the Neuse River in Wake County, with the downstream end of the project located at Anderson Point Park. The project requires one open cut crossing of the Neuse River, two trenchless crossings beneath NCDOT controlled access roadways and the Carolina Coastal Railway, construction in residential areas, construction along an active greenway, and most of the construction is in flood plain area. The total estimated cost of construction is $38 million. This project is expected to advertise for construction in the Summer of 2020 and the construction contract period is expected to be 720 days. Location 2 Upper Walnut Creek Interceptor: This project involves the construction of approximately18,800 LF of 60-inch fiberglass-reinforced polymer and reinforced concrete fiberglass lined gravity sanitary sewer installed by open cut with approximately 80 polymer concrete and T-Base manholes and approximately 6,700 LF of 8-inch through 12-inch tributary sanitary sewer pipe along Walnut Creek in Wake County, North Carolina upstream of the Walnut Creek Softball Complex at Sunnybrook Road. The project includes 300 LF of 62.90-inch OD fiberglassreinforced polymer jacking pipe installed by microtunneling under Sunnybrook Road and Rock Quarry Road. The total estimated cost of construction is $28.8 million. This project is expected to advertise for construction in the Fall of 2020 and the construction contract period is expected to be 540 days. Location 3 Neuse River East Parallel Interceptor: This project involves the construction of approximately 26,000 LF of 96- and 84-inch fiberglass-reinforced polymer gravity sanitary sewer pipe along the Neuse River in Wake County, North Carolina from the City of Raleigh Neuse River Resource Recovery Facility to Anderson Point Park. The project requires two open cut crossings of the Neuse River, two hand excavation tunnels with liner plat beneath NCDOT roadways, abandonment of two existing sewer lift stations, construction in residential areas, and most of the construction in flood plain area. The total estimated cost of construction is $75 million. This project is expected to advertise for construction in the Summer of 2020 and the construction contract period is expected to be 730 days.

Details

Division 03 - Concrete, Precast Concrete.
Division 33 - Utilities, Sanitary Sewerage Utilities, Sanitary Utility Sewerage Piping, Sanitary Utility Sewerage Force Mains, Sanitary Utility Sewerage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents