Similar Projects
Phase 2 Grading and Drainage Improvements Cozy Point Ranch
Infrastructure
Bidding
$400,000 CJ est. value
Snowmass Village, CO 81615

Fleet Shop Fluid Room Renovations
Renovation
Bidding
$195,000 CJ est. value
Lakewood, CO 80215

Boettcher Concert Hall Audio System Integration
Renovation
Sub-Bidding
$400,000 CJ est. value
Denver, CO 80202

Street Condition Distress Assessment-5-Year Pavement Management Plan
Term Contract
Sub-Bidding
Severance, CO 80550

Concrete Contractors for Pouring Concrete Slabs at the Alamosa K-2 Elementary School
Post-Bid
Alamosa, CO 81101

Construct Vehicle Storage for High-Altitude Army Aviation Training Site (HAATS)
New Construction, Infrastructure - 6,191 SF
Post-Bid
$1,700,000 CJ est. value
Gypsum, CO 81637

NCCWTP Concrete Repairs
Results
$100,000 to $130,000 est. value
Denver, CO

Pagosa Springs Brine Building Concrete Work
Renovation
Results
$125,000 est. value
Pagosa Springs, CO 81147

2023 Paving Program
Infrastructure
Construction
$760,000 CJ est. value
Firestone, CO 80520

RFP D/B- Main Street Lighting Project
Infrastructure
Bidding
$200,000 CJ est. value
Lyons, CO 80540

Various Concrete Projects/Repairs
Alteration
Post-Bid
CO

Operations On-Call Concrete Replacement and Repair
Alteration
Results
Lafayette, CO

Waterline Restraint Rehabilitation 2023
Infrastructure
Bidding
$500,000 CJ est. value
Rifle, CO 81650

Concrete Repairs and Replacement Services
Term Contract
Post-Bid
Westminster, CO

Precast Foundations
Alteration
Results
Fort Collins, CO

Last Updated 05/05/2023 08:35 AM
Project Title

Eisenhower-Johnson Memorial Tunnel Plenum Liner Consolidation Grouting

Physical Address View project details and contacts
City, State (County) Keystone, CO 80435   (Summit County)
Category(s) Single Trades
Sub-Category(s) Concrete
Contracting Method Competitive Bids
Project Status Results, Construction start expected May 2023
Bids Due View project details and contacts
Estimated Value $20,000,000 [brand] Estimate
Plans Available from Civil Engineer - 02/09/23
Owner View project details and contacts
Architect View project details and contacts
Description

This work consists of drilling consolidation grout holes in rock within the Eisenhower Tunnel supply air plenum for the purpose of consolidation grouting the rockmass surrounding the tunnel. The purpose of the consolidation grouting program is to decrease the overall permeability of the rockmass in the tunnel sections shown on the drawings. The consolidation grout holes will penetrate through both the permanent tunnel lining and initial tunnel support elements prior to penetrating the rockmass. Region: 1 Counties: Clear Creek, Summit Projects: FBR 0703-520 Read Order No. 003 Fixed Completion Date: 10/31/2024 UDBE Goal: 0.00% Eisenhower-johnson Memorial Tunnel It is estimated that the total cost of all items in the bid will be: ( ) Between $0 and $1,000,000 ( ) Between $1,000,000 and $5,000,000 ( ) Between $5,000,000 and $20,000,000 (X) Greater than $20,000,000 CODOT - 001 - Eisenhower-Johnson Memorial Tunnel *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Details

Division 03 - Concrete, Cast-in-Place Concrete.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents