Similar Projects
Maple Lane Resurfacing - 14 Mile Road to Volpe - City of Sterling Heights
Infrastructure, Alteration
Conception
$1,800,000 est. value
Sterling Heights, MI 48312

American Muslim Diversity Association
Addition, Demolition, Infrastructure - 13,348 SF
Design
$4,300,000 CJ est. value
Sterling Heights, MI 48314

Speedway Gas Station and Convenience Store / Shelby Township
New Construction, Infrastructure - 4,608 SF
Design
$1,400,000 CJ est. value
Shelby Township, MI 48317

Take 5 Oil Change / Warren
New Construction, Infrastructure - 1,430 SF
Bidding
$420,000 CJ est. value
Warren, MI 48093

Plumbrook Road Improvements, Van Dyke Avenue to Utica Road
Infrastructure
Bidding
$4,000,000 CJ est. value
Sterling Heights, MI 48312

Roseville Community Schools BP#26 - 2023 District Renovations
Renovation
Sub-Bidding
$2,000,000 CJ est. value
Roseville, MI 48066

Roseville Community Schools BP#26 - 2023 District Renovations
Renovation
Sub-Bidding
$2,000,000 CJ est. value
Roseville, MI 48066

Administration Building Renovations
Renovation
Post-Bid
Warren, MI

Administration Building Renovations
Renovation
Post-Bid
Warren, MI

Center Line High School Renovation BP21-2
Renovation
Results
Center Line, MI 48015

Mount Clemens High School Elevator Renovation
Renovation
Results
Mount Clemens, MI 48043

Infrastructure Improvements - 2022 Bond - Warren Consolidated Schools
Renovation, Infrastructure
Pending Verification
$70,000,000 CJ est. value
Warren, MI 48093

Infrastructure Improvements - 2022 Bond - Warren Consolidated Schools
Renovation, Infrastructure
Pending Verification
$70,000,000 CJ est. value
Warren, MI 48093

Mound and Jewell Pathway Gaps
Infrastructure
Design
$800,000 CJ est. value
New Baltimore, MI 48051

Macomb County 2022 Paving Projects 16th Circuit Court/Old County Building
Infrastructure, Renovation
Bidding
$500,000 CJ est. value
Clinton Township, MI 48036

Last Updated 08/11/2022 12:32 PM
Project Title

Athletic, Arts, Playground, and Site Improvements - 2022 Bond - Warren Consolidated Schools

Physical Address View project details and contacts
City, State (County) Warren, MI 48093   (Macomb County)
Category(s) Education, Entertainment/Recreation, Heavy and Highway
Sub-Category(s) Athletic Facility, Elementary School, Middle/Senior High School, Site Development
Contracting Method Competitive Bids
Project Status Obtained from a credible source, Awaiting verification, Construction start expected June 2023
Bids Due View project details and contacts
Estimated Value $16,250,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Work includes upgrades for athletic fields, scoreboards, playground structure, gymnasium, pool, and lockers. As of August 10, 2022, this project is in the conceptual phase. The bond has been approved. An construction manager has been selected for the project. Although a firm timeline for construction has not been determined, construction is not expected to start prior to late 2022/2023. *Project information, including timeline and contacts, has been obtained through public sources. The content management team continues to pursue additional details; however, the contact(s) listed have yet to disclose or confirm any information. Inquiries should be directed to the contact(s) listed.

Details

Division 01 - General Requirements, Construction Facilities.
Division 03 - Concrete, Concrete Forming and Accessories, Concrete Forming, Concrete Accessories, Concrete Reinforcing, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Steel Joist Framing, Metal Fabrications.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Metal Doors and Frames, Specialty Doors and Frames, Entrances, Storefronts, and Curtain Walls, Entrances and Storefronts, Windows, Hardware, Mirrors, Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Ceilings, Acoustical Ceilings, Flooring, Resilient Flooring, Carpeting, Painting.
Division 10 - Specialties, Visual Display Units, Chalkboards, Markerboards, Tackboards, Signage, Compartments and Cubicles, Toilet Compartments, Shower and Dressing Compartments, Toilet, Bath, and Laundry Accessories, Toilet Accessories, Emergency Aid Specialties, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Lockers, Flagpoles.
Division 11 - Equipment, Foodservice Equipment, Foodservice Storage Equipment, Food Preparation Equipment, Food Delivery Carts and Conveyors, Food Cooking Equipment, Food Dispensing Equipment, Service Line Equipment, Ice Machines, Cleaning and Disposal Equipment, Educational and Scientific Equipment, Library Equipment, Audio-Visual Equipment, Laboratory Equipment, Athletic and Recreational Equipment, Play Field Equipment and Structures.
Division 12 - Furnishings, Window Treatments, Casework, Countertops, Furniture, Office Furniture, Institutional Furniture, Classroom Furniture, Multiple Seating.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Common Work Results for Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Facility Water Distribution, Facility Sanitary Sewerage, Facility Storm Drainage, Plumbing Equipment, Plumbing Fixtures, Commercial Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, HVAC Insulation, Instrumentation and Control for HVAC, HVAC Air Distribution, Ventilation Hoods, Commercial-Kitchen Hoods.
Division 25 - Integrated Automation.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Common Work Results for Communications, Structured Cabling, Data Communications, Voice Communications, Audio-Video Communications, Audio-Video Systems, Integrated Audio-Video Systems and Equipment, Integrated Audio-Video Systems and Equipment for Classrooms, Distributed Communications and Monitoring Systems, Distributed Audio-Video Communications Systems, Paging Systems, Public Address Systems.
Division 28 - Electronic Safety and Security, Common Work Results for Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Electronic Detection and Alarm, Fire Detection and Alarm.
Division 31 - Earthwork, Common Work Results for Earthwork, Site Clearing, Earth Moving, Grading, Excavation and Fill, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Speed Bumps, Pavement Markings, Athletic and Recreational Surfacing, Fences and Gates, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents