Similar Projects
Chapter Building 2
New Construction - 156,000 SF
Conception
Seattle, WA 98105

Bellevue 305 - 108th Avenue Office Tower
New Construction
Conception
$10,000,000 est. value
Bellevue, WA 98004

Bellevue 600 Office Tower
New Construction - 98,084 SF
Design
Hunts Point, WA 98004

Chapter Building 1
New Construction - 251,000 SF
Design
$1,000,000 to $5,000,000 CJ est. value
Seattle, WA 98105

Salt Storage Bin Fabric Building
New Construction
Bidding
$600,000 est. value
Issaquah, WA

Public Storage
New Construction - 81,041 SF
Post-Bid
Kent, WA 98032

Public Storage
New Construction - 81,041 SF
Post-Bid
Kent, WA 98032

Central Maintenance Facility (Renton Shop)
New Construction
Results
$31,707,852 est. value
Renton, WA 98056

KCSO Detective Unit Relocation
Renovation
Results
Seattle, WA 98104

Spring District Block 6 Office Building Parking Garage Retail
New Construction, Build-Out - 2,160 SF
Construction
$10,000,000 CJ est. value
Bellevue, WA 98005

Spring District Block 5 Office Building and Parking Garage
New Construction - 4,000 SF
Construction
$10,000,000 CJ est. value
Bellevue, WA 98005

Latona Station Apartments
New Construction - 194,500 SF
Pending Verification
$10,000,000 CJ est. value
Seattle, WA 98105

Latona Station Apartments
New Construction - 194,500 SF
Pending Verification
$10,000,000 CJ est. value
Seattle, WA 98105

NW Leary Way Redevelopment
Renovation - 35,750 SF
Conception
$2,000,000 est. value
Seattle, WA 98107

800 Stewart
New Construction - 702,349 SF
Design
$10,000,000 CJ est. value
Seattle, WA 98101

Last Updated 06/27/2022 12:44 PM
Project Title

Maintenance and Operations Center Moc-2

Physical Address View project details and contacts
City, State (County) Seattle, WA 98108   (King County)
Category(s) Commercial
Sub-Category(s) Office, Warehouse/Storage
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $1,780,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The Project is a build-out to an existing building including renovated office space, build-out in the existing warehouse, structural upgrades, and accessibility improvements. Scope involves modification to the fire sprinkler service, fire alarm, and electrical systems; build-out of the warehouse space with new partitions, new rooftop mechanical units with through roof penetrations, and structural upgrades at roof level; demolition and renovation of existing restrooms to bring up to ADA compliance; low-voltage and security improvements in coordination with the Owner’s vendors.

Details

Office, Renovation, Warehouse/Storage, Renovation.
Division 02 - Existing Conditions, Demolition, Selective Demolition, Selective Interior Demolition.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Flooring, Painting and Coating.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Lighting.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents