Similar Projects
Twin Valley Road Improvements
Infrastructure
Bidding

Fond Du Lac - Chilton, Drainage Way Culvert Replacement
Infrastructure
Bidding
$750,000 to $999,999 est. value
WI

LRIP Maple Drive - 2021 Road Project
Post-Bid
Campbellsport, WI 53010

LRIP Pulverizing and Repaving
Post-Bid
WI

Road and General Construction Multiple Award IDIQ for the Chequamegon-Nicolet NF
Results
$5,000 to $7,000,000 est. value

Village of Brandon, CTH TC - WCPL
Results
Brandon, WI 53919

Road Work
Infrastructure
Post-Bid
Campbellsport, WI

Fox Lake - Waupun, Edgelawn Drive to West Street, C. Waupun, Fox Lake Street, West Street to STH 49
Results
Fox Lake, Waupun, WI 53933

2022 Utility and Street Construction
Infrastructure
Post-Bid
Fond du Lac, WI

V. Oakfield, CTH D, CTH Y - N. School Street
Results
Oakfield, WI 53065

2022 14th Street Construction
Infrastructure
Post-Bid
Fond du Lac, WI

Baumann Street - Triple S Road Improvements
Results
Campbellsport, WI 53010

Airfield Paving Construction MATOC
Results
Less than $400,000,000 est. value

Fond du Lac - Plymouth, USH 151 - Seven Hills Road
Results
Fond du Lac, Plymouth, WI

Bechaud Avenue and Polk Street Improvements - Roadway Construction
Results
North Fond du Lac, WI 54937

Last Updated 03/21/2022 09:57 AM
Project Title

Asphalt Paving

Physical Address View project details and contacts
City, State (County) Waupun, WI 53963   (Fond du Lac County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

West Lincoln Street (Bly to Beaver Dam) Pioneer Avenue (Rock Avenue to North West Street) Edgewood Drive (Brandon Street to Beske Street) – LRIP FUNDED Hawthorn Drive – (Astra Drive to Madison Street) Commercial Street (West Franklin Street to Taylor Street) Alley (Between North Grove Street and Moore Street) Project consists of bituminous milling, pulverizing, and bituminous paving of existing streets. Greater details will be given in construction specifications. Project consists of bituminous milling, pulverizing, and bituminous paving of existing streets.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents