Similar Projects
Riverside Rotary Park Restrooms - Juneau-City & Borough
New Construction, Infrastructure
Conception
$600,000 CJ est. value
Juneau, AK 99801

Riverside Rotary Park Restrooms - Juneau-City & Borough
New Construction, Infrastructure
Conception
$600,000 CJ est. value
Juneau, AK 99801

Juneau Ranger District Snowplowing
Term Contract
Post-Bid
Juneau, AK 99801

RFP Engineering - Auke Bay East Berth - Ferry Terminal Improvements - Design Services
Infrastructure
Post-Bid
$1,000,000 CJ est. value
Juneau, AK 99801

Resurface Jnu Mendenhall Loop Road from Egan Drive to Trinity Drive
Infrastructure
Results
$2,500,000 to $5,000,000 est. value
Juneau, AK 99801

Resurface Old Seward Highway From Dimond Boulevard to Dowling Road
Infrastructure
Results
$2,500,000 to $5,000,000 est. value

Wastewater Decant Station at the Juneau Douglas Wastewater Treatment Plant - City of Borough of Juneau
New Construction, Infrastructure
Pending Verification
$400,000 CJ est. value
Juneau, AK 99801

Aurora Harbor Rebuild-Phase III - City and Borough of Juneau
Infrastructure
Conception
$4,000,000 CJ est. value
Juneau, AK 99801

SR M and O Juneau Non-NHS Chip Seal 22
Infrastructure
Results
$500,000 to $1,000,000 est. value
AK

Egan Drive Water Crossings Repl, Norway Point, Highland Drive, Salmon Creek - City and Borough of Juneau
Infrastructure
Conception
$800,000 CJ est. value
Juneau, AK 99801

Lombardo Drive - Road Improvements
Term Contract
Results

Treadwell Ice Arena Parking Lot Paving - City and Borough of Juneau
Infrastructure
Conception
$280,000 CJ est. value
Juneau, AK 99824

SR Regionwide NHS Slope Stabilization
Infrastructure
Results
$500,000 to $1,000,000 est. value
Juneau, AK

Riverside Rotary Park Parking Lot and Pathway Repairs, Lighting - City and Borough of Juneau
Infrastructure
Conception
$650,000 CJ est. value
Juneau, AK 99801

JNU Thane Road 00039 - Dec 20 SE PR
Infrastructure
Results
$500,000 to $1,000,000 est. value
Juneau, AK 99801

Last Updated 01/27/2023 08:41 AM
Project Title

Crow Hill Resurfacing and Utility Rehabilitation

Physical Address View project details and contacts
City, State (County) Juneau, AK 99824   (Juneau County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Maintenance, Paving/Reconstruction, Site Development, Water Lines
Contracting Method Competitive Bids
Project Status All Bids Received, Results Expected, Construction start expected March 2023
Bids Due View project details and contacts
Estimated Value $1,900,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

This Project consists of reconstruction of Crow Hill Drive from Douglas Highway to the end of asphalt prior to gated access, to include the intersection of Crow Hill Drive and Lawson Creek Road. Work includes replacement of the road base and asphalt, asphalt sidewalks, and curb and gutter. Work includes clearing and grubbing, excavation, replacement of the water main, some sewer work, and addition of storm pipes and drainage structures. ENGINEER'S ESTIMATE RANGE: Between $1,700,000 and $1,900,000. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. DEADLINE FOR BIDDER QUESTIONS: 4:30pm Alaska Time on January 17, 2023.

Details

Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents