Similar Projects
City of St. Marys Tomlinson Substation
Post-Bid
Saint Marys, OH

Big Run Maintenance Conversion
Post-Bid
Less than $250,000 est. value
Columbus, OH 43205

Energy Service Providers for Self Funding Energy Efficiency Improvements
Results
South Euclid, OH

Z--Re-Solicitation - Upgrade UPS and AC
Results
$500,000 to $1,000,000 est. value
Clifton, OH 45220

LED Lighting Upgrades
Post-Bid
Less than $129,408 est. value
Middletown, OH 45044

MSC 308 Digital Forensics
Results
Less than $178,225 est. value
Bowling Green, OH 43402

Design-Build Services for On-Site Solar Photo Voltaic Installations at City of Cleveland Facilities
Post-Bid
Cleveland, OH 44114

2500 KVA Transformer
Results
Hamilton, OH

USAF Install Redundant Cooler WPAFB, OH
Post-Bid
$1,000,000 to $5,000,000 est. value
Wright Patterson Air Force Base, OH

Energy Conservation and Facility Infrastructure Improvement Project
Renovation - 408,664 SF
Results
Toledo, OH 43604

Campground West Loop Electrification
Post-Bid
Less than $110,000 est. value
Fremont, OH 43431

Solar Power Developers
Results
Kent, OH

JPWWTP- Electric Gate Actuators
Post-Bid
Columbus, OH

69 KV Underground Cable Replacement
Results
Less than $1,600,000 est. value
Westerville, OH 43081

Generator Inspection and Maintenance Services
Term Contract
Post-Bid
Westerville, OH

Reported 03/17/2020 12:00 AM
Project Title

Electric Delivery, Distribution, and Transmission Services to Wright-Patterson AFB

Physical Address View project details and contacts
City, State (County) Wright Patterson Air Force Base, OH   (Greene County)
Category(s) Single Trades
Sub-Category(s) Electric
Contracting Method Competitive Bids.
Project Status Accepting Letters of Interest
Bids Due View project details and contacts
Estimated Value
Plans Available from Federal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Contractor shall furnish all labor, materials, equipment, and supplies necessary to complete the requirements for this service to WPAFB: Contractor shall provide electric delivery, transmission, and distribution services to match real time demand load and energy usage at WPAFB. Defense Logistics Agency (DLA) future nominated contractor will supply the needed mega-watts capacity (MW) and electric energy (MWH). The current peak demand at WPAFB is 82 (MW) with a consumption of 417,700 (MWh) from 01 Oct – 30 Sept 2019. WPAFB anticipates a load increase over the next year to 87.0 MW of demand and 470,000 MWh of consumption.

Details

Division 01 - General Requirements.
Division 26 - Electrical.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents