Similar Projects
Reported | 07/02/2021 12:00 AM |
Project Title | Water Bottle Filling Stations With ADA Cooler General Conditions and Statement of Work |
Physical Address | View project details and contacts |
City, State (County) | Rockville, MD (Montgomery County) |
Category(s) | Single Trades |
Sub-Category(s) | Plumbing |
Contracting Method | Competitive Bids. |
Project Status | Request for Proposals (RFPs) |
Bids Due | View project details and contacts |
Estimated Value | |
Plans Available from | County Agency |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Supply and installation of (2) Bottle Filling Stations with Single ADA Cooler - Filtered, basis of design is Elkay EZH20 model number LZS8WSVRSK, at up to 120 existing schools. Other brands which will be considered are Halsey Taylor and Oasis. Total estimated number of installations will be 240 units. Each school will have 2 units installed at separate locations in close proximity to the existing cafeteria and gymnasium. The installer will work with MCPS staff to determine the final location at each facility. The brand and model to be installed will be determined and approved based upon that which is most applicable for the replacement of the existing water cooler at each facility. |
||
Details |
|
||
Bidder's List | View project details and contacts | ||
Prospective Bidders | View project details and contacts | ||
Project Documents |
![]() Engineered Spec Sheet ![]() Architectural Plans ![]() Other Documents |