Similar Projects
East Arkansas Avenue Mixed Use
New Construction, Demolition - 150,000 SF
Conception
$10,000,000 CJ est. value
Denver, CO 80231

Village at Wolf Creek
New Construction
Conception
Pagosa Springs, CO 81147

Levande on 12th Apartments
New Construction
Design
Grand Junction, CO 81501

4055 North Elati Street Mixed Use
New Construction - 67,476 SF
Design
Denver, CO 80110

Pena Station Next
New Construction - 217,000 SF
Post-Bid
Denver, CO 80249

Girard Apartments
New Construction - 21,213 SF
Post-Bid
$2,500,000 est. value
Aurora, CO 80231

ADA Interior Modernization of Five Units at the Katherine Bates Apartments
Results
$150,000 to $200,000 est. value
Colorado Springs, CO 80900

New Construction of Two South Slope Houses
New Construction
Results
Colorado Springs, CO 80947

Brick Stone on Harmony
New Construction - 202,000 SF
Construction
$10,000,000 CJ est. value
Fort Collins, CO

Sherman Westminster Block B3
New Construction - 93,283 SF
Construction
$61,000,000 est. value
Westminster, CO 80031

Gates District At Broadway Station Master Plan
New Construction - 560,000 SF
Pending Verification
$10,000,000 CJ est. value
Denver, CO 80210

601 16th Street Mixed-Use
New Construction - 315,000 SF
Pending Verification
Denver, CO

Hughes Stadium Redevelopment
New Construction
Conception
Fort Collins, CO 80526

Thunderhead Station
New Construction - 23,363 SF
Design
Steamboat Springs, CO 80487

Springstone
New Construction - 260,000 SF
Post-Bid
Colorado Springs, CO 80901

Last Updated 01/29/2021 01:23 PM
Project Title

Copeland Canyon Condos Phase 3

Physical Address View project details and contacts
City, State (County) Highlands Ranch, CO 80126   (Douglas County)
Category(s) Residential
Sub-Category(s) Apartments/Condominiums
Contracting Method
Project Status Construction Complete as of fourth quarter 2020
Bids Due View project details and contacts
Estimated Value $2,000,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Details

1 Apartments/Condominiums, 3 Stories Above Grade, 19,000 SF New Construction 3 Buildings.
Division 03 - Concrete, Concrete Forming and Accessories, Precast Concrete, Site-Cast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Architectural Woodwork, Architectural Wood Casework.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Wood Doors, Plastic Doors, Windows, Hardware, Glazing, Louvers and Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Carpeting, Painting and Coating.
Division 10 - Specialties, Toilet, Bath, and Laundry Accessories.
Division 11 - Equipment, Residential Equipment, Residential Appliances.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Residential Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting.
Division 27 - Communications, Structured Cabling.
Division 31 - Earthwork, Grading, Excavation and Fill, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents