Similar Projects
Annual Contract/Painting and Weatherproofing
Term Contract
Bidding
FL

Palm Beach County Sheriff's Office Exterior Hardening
Post-Bid
West Palm Beach, FL

CM-at-Risk Services - Architecture Building Exterior Envelope Repair
Post-Bid
Less than $5,000,000 est. value
Gainesville, FL

Sunshade Structure - EPA Gulf Breeze, FL
Results
Gulf Breeze, FL 32561

40 - Year Repairs for Aquatic Complex, City Hall and Wastewater Plant
Results
Less than $700,000 est. value
Fort Lauderdale, FL

UCF Downtown/Dr. Phillips Academic Commons
Construction
$66,000,000 est. value
FL

Lee County Downtown Jail Corridor Ceiling Replacement
Construction
Fort Myers, FL 33901

54--Building Roof Top Guardrail System
Post-Bid
Panama City, FL 32407

TGK Facility Re-Roof - Pressure Wash and Seal Exterior Building
Results
Less than $3,350,000 est. value
FL

Awning Repair, Recover and Install
Post-Bid
Less than $25,000 est. value
Sarasota, FL 34235

N--Service: Recover Awnings Building 2 and 42
Results
Tampa, FL 33612

Exterior Painting Projects for Vernon E. Hargray Youth Enrichment Center and Sunset Lakes Community Center
Post-Bid
Miramar, FL 33025

UCF Spectrum Stadium Rust Remediation
Results
Orlando, FL 32816

Gutter Replacement
Post-Bid
Palm Harbor, FL 34683

Facility Maintenance Services for Cecil Airport
Results
Jacksonville, FL 32221

Reported 11/18/2020 06:36 PM
Project Title

Sun Splash Lazy River Joint Repair

Physical Address View project details and contacts
City, State (County) Cape Coral, FL 33991   (Lee County)
Category(s) Single Trades
Sub-Category(s) Finishes/Exterior
Contracting Method Competitive Bids.
Project Status All Bids Rejected, Project to Rebid
Bids Due View project details and contacts
Estimated Value
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

The project consists of removal of the existing pool joints and installation of new waterproof joints for the Lazy River at the Sun Splash Water Park Facility, located at 400 Santa Barbara Boulevard, Cape Coral, FL. The work generally consists of removal and disposal of existing joint material, installation of new waterproof joint materials to include, new sealant, steel reinforcing, concrete, PVC water stop and expansion material.

Details

Division 03 - Concrete, Concrete Accessories, Waterstops, Reinforcement Bars, Stainless Steel Reinforcement Bars.
Division 09 - Finishes.
Division 22 - Plumbing, Pool and Fountain Plumbing Systems.
Division 32 - Exterior Improvements, Rigid Paving, Concrete Paving Joint Sealants, Fuel-Resistant Concrete Paving Joint Sealants.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents