Similar Projects
2022 On Call Contractor for Miscellaneous Utility Reconstruction
Term Contract
Bidding
Medford, NJ

Watermain Improvements for East Union Street
Infrastructure
Bidding
Bordentown, NJ 08505

Cold Water Meter with Integrated Meter Interface Unit
Post-Bid
Marlton, NJ

Water Main Replacement on Latimer Way and Neck Road
Post-Bid
Burlington, NJ 08016

4610--VHA Mar Cor Reverse Osmosis Water Purification BNOE | Sources Sought | 36U10120Q0029
Results

Pipe Ductile Iron
Term Contract
Results
Mount Holly, NJ 08060

Watermain Replacement for Brooks Avenue
Infrastructure
Bidding
Bordentown, NJ 08505

2020 Fire Hydrant Replacements
Post-Bid
Maple Shade, NJ

Emergency Repair Services
Results
Marlton, NJ 08053

Emergency Repairs to Utilities at Various State Secured Facilities
Term Contract
Post-Bid

Indigo Drive Water Main Replacement Project Phase 3
Results
Mount Laurel, NJ 08054

Deborah Chlorine Contact Main Installation Contract
Infrastructure
Post-Bid
Pemberton, NJ

Hartford Road WPCF Piping Heat Tracing and Insulation
Results
$208,000 est. value
Willingboro, NJ

Water Filtration Plant Dehumidification Unit Installations
Infrastructure
Post-Bid
Willingboro, NJ 08046

Watermain Improvements for Oliver Street
Results
Bordentown, NJ 08505

Last Updated 12/16/2021 10:57 AM
Project Title

Water Main Replacement on Cornell, Dickinson and Fordham

Physical Address View project details and contacts
City, State (County) Burlington, NJ   (Burlington County)
Category(s) Sewer and Water
Sub-Category(s) Water Lines
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $633,665
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The major estimated item quantities are summarized as follows: Approx. Estimated Quantities Base Bid 1A. Breakaway Barricades 2 UN 1B. Construction Signs 100 SF 1C. Drums 10 UN 1D. Cones 25 UN 2. 8" Dia. CLDIP Water Main 2,950 LF 3. 8" Dia. Gate Valve and Valve Box 8 UN 4. 6" Insertion Valve 1 UN 5. Install New Fire Hydrant 4 UN 6A. 3/4 " Water Service with Curb Stop & Box 975 LF 6B. 1" Water Service with Curb Stop & Box 65 LF 7. Select Backfill, If & Where Directed 100 CY 8. Trench Stabilization, If & Where Directed 100 CY 9. Hot Mix Asphalt Trench Restoration 3,915 LF 10. Reconstruction of Existing Storm Sewer 50 LF 11. Water Main Lowering 3 UN

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents