Similar Projects
Hickory Tavern Elevated Water Tank
Infrastructure
Bidding
Laurens, SC 29360

Elevated Storage Tank Coating
Post-Bid
Georgetown, SC 29440

North 5th Street Tank Rehabilitation
Post-Bid
Less than $180,000 est. value
Hartsville, SC 29551

Salt, Brine, and Anti-Icing or De-Icing Agents, and Brine Production and Storage Systems
Results

Salt, Brine, and Anti-Icing or De-Icing Agents, and Brine Production and Storage Systems
Results

Tank Farm Relocation
Post-Bid
Less than $200,000 est. value
Cheraw, SC

World-Wide Water Storage Tank Remediation
Term Contract
Results

Fy21 Construction of Lake Marion Water Tower
Post-Bid
$1,000,000 to $5,000,000 est. value
Harleyville, SC

Parsons Elevated Tank Rehabilitation
Results
Georgetown, SC 29440

Charter Oak
Post-Bid
Lexington, SC

Pump Station 290 Storage Tank
Results
Less than $197,285 est. value
Pawley's Island, SC 29585

Underground Storage Tank
Post-Bid
SC

Conway Mills Elevated Tank Modifications
Results
Conway, SC 29528

Sources Sought/Request for Information (SS/RFI) For Cleaning, Surface Preparation, and Recoating Services of Water Tanks at The Savannah River Site Near Aiken, South Carolina
Post-Bid
Aiken, SC

Removal of Aboveground Storage Tanks (AST)
Results
$25,000 to $100,000 est. value
Whitmire, SC 29178

Reported 03/01/2022 12:00 AM
Project Title

Expression of Interest (EOI) for Construction of Saltstone Disposal Units (SDU) 10-12 at The Savannah River Site - Located Near Aiken, South Carolina

Physical Address View project details and contacts
City, State (County) Aiken, SC   (Aiken County)
Category(s) Sewer and Water
Sub-Category(s) Storage/Water Tanks
Contracting Method Competitive Bids.
Project Status Accepting Letters of Interest
Bids Due View project details and contacts
Estimated Value
Plans Available from Federal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

The Scope of Work Includes: Volume for each tank is approximately 32 million gallons Reinforced concrete integral base slab/wall footing construction; Flexible base slab to wall joint including water-stop and bearing and filler pads; Erection of cast-in-place tank core walls including water stop installation between wall segments, lateral cables and vertical post tensioning system; Roof support columns with column capitals; Concrete roof slab construction; External horizontal pre-stressing wrapping of core wall including shotcrete layers and cover using automated equipment; and Epoxy injection of any leaks in walls through cracks, voids or joints, requiring return to site as Leak Tightness testing will be performed by others after installation of an interior liner system The Scope Excludes: Leak Tightness Testing, which will be conducted following installation of an interior liner system; Design; Site Preparation, inclusive of installation of mudmats and HDPE/GCL Liner beneath the floor slab; Balance of Plant infrastructure; and Installation of Interior Liner System

Details

Division 01 - General Requirements, Site Construction Performance Requirements, Site Preparation Performance Requirements.
Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Reinforcing, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Metal Decking.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Specialty Doors and Frames, Windows, Hardware.
Division 09 - Finishes, Flooring, Painting and Coating.
Division 11 - Equipment, Laboratory Equipment.
Division 13 - Special Construction.
Division 14 - Conveying Equipment.
Division 21 - Fire Suppression, Fire-Extinguishing Systems.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, Facility Fuel Piping, Facility Fuel-Storage Tanks, HVAC Air Distribution.
Division 25 - Integrated Automation.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Video Surveillance, Fire Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Clearing and Grubbing, Grading, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities.
Division 40 - Process Integration, Water Process Piping, Pneumatic Conveying Lines, Instrumentation and Control for Process Systems.
Division 41 - Material Processing and Handling Equipment, Bulk Material Processing Equipment, Bulk Material Conveying Equipment, Bulk Material Feeders, Batching Equipment, Conveyors, Cranes and Hoists, Specialty Material Handling Equipment, Manufacturing Equipment, Manufacturing Lines and Equipment, Container Processing and Packaging.
Division 44 - Pollution and Waste Control Equipment, Air Pollution Control, Odor Control, Water Pollution Control Equipment, Water Pollution Containment and Cleanup Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents