Similar Projects
FM 108 Linear Improvements - City of Republic
Infrastructure
Conception
$1,523,500 est. value
Republic, MO

FM 115 Inflow and Infiltration Reduction - City of Republic
Infrastructure
Conception
$1,440,500 est. value
Republic, MO

South Lone Pine Mixed Use
New Construction, Infrastructure - 132,600 SF
Design
$35,000,000 CJ est. value
Springfield, MO 65804

Boyce Mixed Use Development
New Construction, Infrastructure
Design
$70,000,000 CJ est. value
Republic, MO 65738

Water Disinfection System Improvements
Infrastructure
Bidding
$500,000 CJ est. value
Willard, MO 65781

Springfield Public Schools Athletics Synthetic Turf Project
Infrastructure
Bidding
$700,000 CJ est. value
Springfield, MO 65806

Building Demolition and Site Cleanup (List 10-26)
Demolition, Infrastructure
Post-Bid
Springfield, MO

Springhouse Village East 2
New Construction, Infrastructure
Post-Bid
$15,986,300 CJ est. value
Springfield, MO 65802

Valves
Infrastructure
Results
Springfield, MO 65807

Water System Materials
Infrastructure
Results
Springfield, MO

Element By Westin - Marriott / Springfield
New Construction, Infrastructure - 71,477 SF
Construction
$22,000,000 CJ est. value
Springfield, MO 65807

Buc-ee's / Springfield
New Construction, Infrastructure - 53,000 SF
Construction
$28,000,000 CJ est. value
Springfield, MO 65803

Simply Smart Self-Storage Facility
New Construction, Infrastructure - 55,500 SF
Pending Verification
$6,000,000 CJ est. value
Republic, MO 65619

OZMOD 425
Demolition, New Construction, Infrastructure - 37,533 SF
Pending Verification
$10,500,000 CJ est. value
Springfield, MO 65803

Farm Road 103 (Future MM) South Of US 60 - City of Republic
Infrastructure
Conception
$1,500,000 est. value
Republic, MO 65619

Last Updated 02/20/2023 04:37 AM
Project Title

Propane Air Plant Relief Valve Replacement

Physical Address View project details and contacts
City, State (County) Springfield, MO 65806   (Greene County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected January 2023
Bids Due View project details and contacts
Estimated Value $200,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

The Work consists of replacing ninety-six (96) two-and-one-half (2-1/2) inch relief valves on twelve (12) sixty thousand (60,000)-gallon propane tanks at City Utilities' Lake Springfield Natural Gas Peak Shaving Plant ("Propane Air Plant") located at 5851 S Kissick Avenue, Springfield, MO. City Utilities will provide the new relief valves. Vendor to provide all required tools, supplies and equipment necessary to perform the work.

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents