Similar Projects
Oak Harbor Intermediate School
New Construction, Renovation
Conception
Oak Harbor, WA 98277

White River High School
Renovation
Conception
$4,178,000 est. value
Buckley, WA

New Transition Services Educational Facility
New Construction - 20,000 SF
Design
$1,000,000 to $5,000,000 CJ est. value
Bellevue, WA

High School Addition
New Construction, Addition - 15,000 SF
Design
Ridgefield, WA

Construction of Pinnacles Prep Charter Public School Phase 1.5A
New Construction
Bidding
$1,300,000 to $1,500,000 est. value
Wenatchee, WA 98801

Relocate and Setup Portable Classrooms at Multiple School Sites
New Construction
Bidding
$2,000,000 est. value
Seattle, WA

ESD 112 Mental Health Center
Renovation
Post-Bid
$1,800,000 est. value
Vancouver, WA 98661

Avanti High School and Annex Remodel
Renovation
Post-Bid
Olympia, WA 98501

Fire Alarm Maintenance And Repair Service
Renovation, Alteration
Results
Vancouver, WA 98686

Design-Build Services Tacoma Online Learning - Tenant Improvements
Renovation - 12,961 SF
Results
$5,000,000 est. value
Tacoma, WA 98402

Capital Projects Bond
Renovation, Addition
Conception
Bothell, WA

Cornerstone Christian Academy Middle/High School
Renovation
Design
Battle Ground, WA 98604

Restorative School Renovation
Renovation
Bidding
$500,000 to $600,000 est. value
Bremerton, WA 98312

District Maintenance Building Improvements
New Construction
Post-Bid
$2,350,000 est. value
Steilacoom, WA

Architectural Services for High School Addition
New Construction, Addition - 15,000 SF
Results
Ridgefield, WA 98642

Reported 06/04/2022 12:00 AM
Project Title

Mark Morris High School Locker Rooms Renovation

Physical Address View project details and contacts
City, State (County) Longview, WA 98632   (Cowlitz County)
Category(s) Education
Sub-Category(s) Middle/Senior High School
Contracting Method Competitive Bids.
Project Status Bidding, Construction Start Expected July 2022
Bids Due View project details and contacts
Estimated Value $800,000 to $850,000
Plans Available from Architect
Owner View project details and contacts
Architect View project details and contacts
Description

Renovate the football locker room and the main floor girls PE locker room at Mark Morris High School. Site Walkthrough 05/12/2022 at 03:30 PM Mandatory Pre-proposal Walk-throughs: 3:30 P.M. Wednesday, May 12 th , 2022 or 3:30 P.M. Friday, May 13th, 2022 Meeting at Back Parking lot at Mark Morris High School, 1602 Mark Morris Ct. Longview, WA. 98632. (Entrance off of Ocean Beach Highway) Attendance at the Pre-Proposal Walk-through is Mandatory for bidders. Contractors are only required to attend one of the two mandatory walk-throughs. Site Walkthrough 05/13/2022 at 03:30 PM Mandatory Pre-proposal Walk-throughs: 3:30 P.M. Wednesday, May 12 th , 2022 or 3:30 P.M. Friday, May 13th, 2022 Meeting at Back Parking lot at Mark Morris High School, 1602 Mark Morris Ct. Longview, WA. 98632. (Entrance off of Ocean Beach Highway) Attendance at the Pre-Proposal Walk-through is Mandatory for bidders. Contractors are only required to attend one of the two mandatory walk-throughs.

Details

Middle/Senior High School, Renovation.
Division 02 - Existing Conditions, Demolition, Selective Demolition, Selective Interior Demolition.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Flooring, Painting and Coating.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Lighting.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents