Similar Projects
Courthouse Landing
New Construction - 480,000 SF
Conception
$290,000,000 est. value
Chesterfield, VA 23832

St James Apartments
New Construction
Conception
Richmond, VA

The Promenade at Winterfield Development
New Construction - 24,000 SF
Design
$1,000,000 to $5,000,000 CJ est. value
Midlothian, VA

Starview Village
New Construction
Design
Richmond, VA

The Line at Fulton Yard Apartments
New Construction - 9,300 SF
Sub-Bidding
$35,000,000 est. value
Richmond, VA 23231

Scott`s Collection - Building 2 and #
New Construction - 161,571 SF
Post-Bid
$10,000,000 CJ est. value
Richmond, VA 23230

Better Housing Coalition Cameo House
New Construction - 76,000 SF
Post-Bid
$11,000,000 est. value
Richmond, VA 23220

DLA Fitness Center Renovation
Renovation
Results
$5,000,000 to $10,000,000 est. value
Richmond, VA 23237

Watkins Centre Apartments
New Construction
Construction
$30,300,000 est. value
Midlothian, VA 24104

Market Square Community - Phase IV
New Construction
Construction
$10,000,000 est. value
Richmond, VA

Residence Inn by Marriott
New Construction - 5,600 SF
Pending Verification
Richmond, VA

Richmond Coliseum
New Construction, Demolition
Pending Verification
Richmond, VA

Carver Square Condominiums
New Construction, Demolition
Conception
Richmond, VA

Pumunkey Tribe Casino
New Construction
Design
$350,000,000 est. value
Richmond, VA

Mixed Use Development
New Construction - 10,000 SF
Post-Bid
$25,000,000 est. value
Richmond, VA

Reported 03/10/2020 11:54 AM
Project Title

The Reserve at Rivington

Physical Address View project details and contacts
City, State (County) Chester, VA 23831   (Chesterfield County)
Category(s) Entertainment/Recreation, Residential
Sub-Category(s) Apartments/Condominiums, Clubhouse/Social Club, Fitness Center
Contracting Method
Project Status Construction Commenced October 2019
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

One, two and three-bedroom units

Details

1 Fitness Center, New Construction, 8 Apartments/Condominiums, 3 Stories Above Grade, New Construction 276 Unit(s), 1 Clubhouse/Social Club, 1 Story Above Grade, 6,800 SF New Construction.
Division 03 - Concrete, Concrete Forming and Accessories, Concrete Forming, Cast-in-Place Concrete, Precast Concrete, Precast Structural Concrete, Site-Cast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Architectural Woodwork, Architectural Wood Casework.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Metal Doors and Frames, Wood Doors, Plastic Doors, Windows, Hardware, Glazing, Mirrors, Louvers and Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Ceilings, Acoustical Ceilings, Specialty Flooring, Carpeting, Acoustic Treatment, Painting and Coating, Painting, Exterior Painting, Interior Painting.
Division 10 - Specialties, Signage, Compartments and Cubicles, Toilet Compartments, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Lockers.
Division 11 - Equipment, Residential Equipment, Residential Appliances, Athletic Equipment, Exercise Equipment.
Division 12 - Furnishings, Rugs and Mats.
Division 13 - Special Construction, Special Activity Rooms, Athletic Rooms.
Division 14 - Conveying Equipment, Elevators, Elevator Equipment and Controls.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Residential Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Piping and Pumps, HVAC Air Distribution, Central HVAC Equipment.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting, Lighting Poles and Standards, Parking Lighting.
Division 27 - Communications, Structured Cabling, Voice Communications, Audio-Video Communications, Distributed Audio-Video Communications Systems, Paging Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Electronic Surveillance, Electronic Detection and Alarm, Fire Detection and Alarm.
Division 31 - Earthwork, Clearing and Grubbing, Grading, Excavation and Fill, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Irrigation, Planting Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents