Similar Projects
Tolland Fire Department Replacement of Stations - 440
Demolition, New Construction, Infrastructure - 4,600 SF
Design
$5,000,000 CJ est. value
Tolland, CT 06084

Clay Sewer Pipe Relining Phase 6
Infrastructure
Bidding
$300,000 CJ est. value
Storrs Mansfield, CT 06269

776 Dart Hill Road
Infrastructure
Bidding
$200,000 CJ est. value
Vernon Rockvl, CT 06066

Kinesiology Human Anatomy Learning Lab Renovations
Renovation - 632 SF
Post-Bid
Storrs, CT 06269

Eagleville Green
New Construction, Infrastructure
Post-Bid
$15,800,000 CJ est. value
Storrs Mansfield, CT 06268

Student Union Office Renovations
- 1,000 SF
Results
$100,000 to $500,000 est. value
Storrs, CT 06269

Bio-Physics Cold Rooms
Renovation
Results
Storrs, CT

Bestway / Bolton
New Construction, Infrastructure - 5,040 SF
Pending Verification
$1,400,000 CJ est. value
Bolton, CT 06043

Able Coil and Electronics Co Expansion
Addition, Demolition, Infrastructure - 12,000 SF
Pending Verification
$1,500,000 CJ est. value
Bolton, CT 06043

Agway / Ellington
New Construction, Infrastructure - 1,764 SF
Bidding
$350,000 CJ est. value
Ellington, CT 06029

Splash Pad
Infrastructure
Post-Bid
$295,307 CJ est. value
Vernon Rockvl, CT 06066

Werth Family Basketball Champions Center Dining Renovation
Renovation
Results
$500,000 est. value
Mansfield, CT 06269

Rotary Upgrade to a Modern Roundabout and Traffic Signal and Railroad Upgrades Spring Street
Infrastructure
Bidding
$5,000,000 CJ est. value
Stafford Springs, CT 06076

Fenton River Well Field and Road
Infrastructure
Post-Bid
$550,000 CJ est. value
Storrs Manfld, CT 06269

North Campus Student Room Renovations Phase 3
Renovation
Results
$3,500,000 est. value
Mansfield, CT 06268

Last Updated 08/30/2022 03:02 PM
Project Title

RFQ Construction Manager at Risk - South Campus Infrastructure

Physical Address View project details and contacts
City, State (County) Storrs Mansfield, CT 06269   (Tolland County)
Category(s) Education, Heavy and Highway
Sub-Category(s) College/University, Site Development
Contracting Method Bids by Invitation, Competitive Bids
Project Status Construction start expected March 2023
Bids Due View project details and contacts
Estimated Value $62,500,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

No award has been made for this project yet. Per the owner, Award may be available in the beginning of October 2022. The Construction Manager must demonstrate the financial ability and bonding capacity to complete a construction project with a minimum value of at least $62.5 million The Vendor Q&A period will end on Jun 30, 2022 2:00 PM EDT .

Details

Division 03 - Concrete, Cast-in-Place Concrete, Concrete Finishing, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Insulation, Weather Barriers.
Division 08 - Openings, Specialty Doors and Frames, Entrances, Automatic Entrances, Windows, Hardware.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Ceilings, Acoustical Ceilings, Acoustical Ceiling Suspension Assemblies, Flooring, Painting.
Division 10 - Specialties, Visual Display Units, Signage, Compartments and Cubicles, Toilet Compartments, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Lockers, Protective Covers, Flagpoles, Flags and Banners.
Division 11 - Equipment, Foodservice Storage Equipment, Food Preparation Equipment, Food Cooking Equipment, Food Dispensing Equipment, Service Line Equipment, Soda Fountain Equipment, Coffee and Espresso Equipment, Ice Machines, Cleaning and Disposal Equipment, Library Equipment, Audio-Visual Equipment, Laboratory Equipment, Broadcast, Theater, and Stage Equipment, Athletic and Recreational Equipment, Athletic Equipment, Play Field Equipment and Structures, Exterior Court Athletic Equipment, Athletic Field Equipment.
Division 12 - Furnishings, Window Treatments, Casework, Countertops, Rugs and Mats, Office Furniture, Seating, Institutional Furniture, Classroom Furniture, Library Furniture, Book Shelves, Multiple Seating.
Division 21 - Fire Suppression.
Division 22 - Plumbing, Plumbing Insulation, Plumbing Piping, Facility Water Distribution, Facility Sanitary Sewerage, Facility Storm Drainage, Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Ventilation Hoods, Central Heating Equipment, Central Cooling Equipment.
Division 26 - Electrical, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting, Lighting Poles and Standards, Parking Lighting, Roadway Lighting, Area Lighting, Flood Lighting, Exterior Athletic Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Call Management, Audio-Video Communications, Distributed Audio-Video Communications Systems, Paging Systems, Public Address Systems.
Division 28 - Electronic Safety and Security, Access Control, Electronic Surveillance, Fire Detection and Alarm.
Division 31 - Earthwork, Clearing and Grubbing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Pavement Markings, Athletic and Recreational Surfacing, Fences and Gates, Planting Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents