Similar Projects
Last Updated | 01/24/2020 09:25 AM |
Project Title | Route 9 Infrastructure Project |
Physical Address | View project details and contacts |
City, State (County) | Charles Town, WV 25414 (Jefferson County) |
Category(s) | Heavy and Highway, Sewer and Water |
Sub-Category(s) | Lift and Pump Stations, Paving/Reconstruction, Pumps and Wells, Shoreline/Erosion/Drainage |
Contracting Method | Competitive Bids. |
Project Status | Results |
Bids Due | View project details and contacts |
Estimated Value | |
Plans Available from | |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | The Route 9 Sewer Project element generally includes: 1.Mobilization and survey stakeout; 2.Installation of erosion and sediment control, measures, preparing a Stormwater Pollution Prevention Plan (SWPPP), and filing a National Pollutant Discharge Elimination System (NPDES) Notice of Intent (NOI); 3.Coordination with concurrent water and roadway construction; 4.Coordination with concurrent manufacturing plant construction; 5.Coordination with concurrent roadway construction; 6.Coordination with adjacent private utility installation (natural gas, communications, and electric power); 7.Traffic control during construction, including developing traffic control and maintenance of traffic plans, and obtaining permits from the authorities having jurisdiction; 8.Trenching; installation of force main and gravity sewer lines, manholes, valves and appurtenances; and trench backfill (~16,000 feet of force main sewers, 4”-8” and ~9,400 feet of gravity sewer, 6”-15”); 9.Installation of steel casing pipes at roadway and railroad crossings (~700 feet of 24”-34” casing); 10.Obtaining utility encroachment permits from CSX Transportation and Norfolk Southern railroads; 11.Providing for rail protective services for work within and adjacent to railroad rights-of-way; 12. Providing rail protective liability and other insurance coverage in the amounts required by the railroads; 13.Construction of the Northport sewage pumping station (Bid Alternate No. 1), including construction of associated earthwork, driveway, vaults and wet wells, pumps and ancillary equipment, controllers, lighting, water service, fencing and gates, and providing electric power service; 14.Construction of the War Admiral sewage pumping station, including construction of associated earthwork, driveway, vaults and wet wells, controllers, lighting, water service, fencing and gates, and providing electric power service; 15.Utility adjustment and relocation as necessary to construct proposed sewer system infrastructure; 16.Fine grading and site stabilization/restoration; and 17.Providing startup, testing, and operator training for all equipment. |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Details |
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Bidder's List | View project details and contacts | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Prospective Bidders | View project details and contacts | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |