Similar Projects
SFB Flooring Renovation
Bidding
Palo Verde, AZ 85343

Carpet Removal & Installation and Tile Abatement
Bidding
Phoenix, AZ

Middle School Asbestos Tile Removal Project
Post-Bid
Bullhead City, AZ

Office Flooring Removal / Installation
Post-Bid
Glendale, AZ

Z--Replace Flooring
Results
Less than $25,000 est. value
Coolidge, AZ 85128

Bldg 20/21 Flooring
Results
Phoenix, AZ 85034

Mechanical Work, Roof Repairs and Wood Flooring
Post-Bid
Ajo, AZ

Flooring Renovation for a Fire House/Fire Administration
Results
Payson, AZ 85541

Interior Remodel of Module Buildings
Post-Bid
Window Rock, AZ

Adult Detention Facility Kitchen Floor and Equipment Replacement
Results
Florence, AZ 85132

Flooring at Alta Vista and Washington
Post-Bid
Phoenix, AZ 85051

Tumbleweed Recreation Center Flooring
Results
Chandler, AZ 85286

Carpet, Tile and LVP
Post-Bid
Tucson, AZ

Men's and Women's Restroom Patch and Paint Walls, Resurface Floors Building L2120
Results
Casa Grande, AZ 85122

Z--Replace Adobe Flooring
Post-Bid
$25,000 to $100,000 est. value
Amado, AZ 85640

Last Updated 05/02/2019 08:20 PM
Project Title

Flooring at Commencement

Physical Address View project details and contacts
City, State (County) Tucson, AZ   (Pima County)
Category(s) Single Trades
Sub-Category(s) Flooring
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from State Agency
Owner View project details and contacts
Architect View project details and contacts
Description Flooring for Commencement at the University of Arizona. We are looking for floor protection rental, with supervisor, to install a heavy-duty system capable of fork lift & crane traffic along with staging support while protecting a synthetic football playing surface underneath. System requirements 1 69,000 Sq. Ft. of Armor Deck 3 (or equivalent) with a strength rating of 45k lbs. per sq. ft. (The photo layout below is simply illustrative of how the flooring should be set up) 2. Installation is approximate, typical use ranges around 66-67k sq. ft., extra is requested to the amount of 69k accommodate adjustments, extreme heat other needs.
Details
Division 09 - Finishes, Flooring.
Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents