Similar Projects
Heating, Ventilation and Air Conditioning Upgrade and Chilled Water Line Installation at the Harris County Credit Union Parking Garage
Bidding
Less than $1,000,000 est. value
Houston, TX 77002

Heating, Ventilation and Air Conditioning Upgrade and Chilled Water Line Replacement at Annex 60
Bidding
Less than $2,000,000 est. value
Houston, TX 77093

HVAC Equipment, Installation, Service, and Related Products
Post-Bid
Houston, TX 77270

Ventilation System at Annex 46
Post-Bid
Houston, TX 77002

Refurbishment of Air Handling Units
Results
$2,600,000 est. value
Houston, TX 77030

HVAC Equipment, Supplies, and Related Items
Term Contract
Results
Baytown, TX

Administration Building Mechanical Renovations
Bidding
$3,000,000 est. value
Houston, TX 77024

Administration Building HVAC Upgrades
Post-Bid
Houston, TX 77015

Chiller Replacement Project
Results
Houston, TX 77000

HVAC Refrigerants
Term Contract
Post-Bid
Houston, TX 77064

Install New Chiller
Results
Houston, TX

Galena Park Middle School HVAC Upgrades
Post-Bid
Galena Park, TX 77547

Replace Two Air Conditioning System
Results
Houston, TX 77040

Air Conditioning, Heating, and Ventilating Equipment, Parts
Post-Bid
Houston, TX 77002

Installation of Heat Exchanger at the North Bayou Central Plant for Harris County
Results
Houston, TX 77002

Reported 04/10/2020 12:00 AM
Project Title

4520--Replace Domestic Hot Water Heater B100 (Va-20-00040229)

Physical Address View project details and contacts
City, State (County) Houston, TX 77030   (Harris County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids.
Project Status Accepting Letters of Interest
Bids Due View project details and contacts
Estimated Value
Plans Available from Federal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

The contractor is to replace (2) two heat exchangers and all associated controls, parts supplies and equipment. Work required to accomplish this will require providing a skid mounted heat exchanger package which includes all controls and tie-in points to the existing distribution system and include all valves, piping, traps, electrical connections and other parts and materials to provide a fully operational domestic hot water system. Once the units are installed and all connections are made the units will then be turned on and allowed to warm up. Once operational temperature is reached the units will be placed into operation. This includes putting at least 90 % load on the units for a minimum of one hour. The units will then be diagnosed for any problems or leaks. All control parameters on the control board will be scrolled through and analyzed to ensure they are all within accepted parameters. CONTRACT REQUIREMENTS Heat Exchanger Package and Specs (CLIN 0001) - All equipment will be replaced with approved OEM manufactured parts and equipment.

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents