Similar Projects
New Water Treatment System
Term Contract, Alteration
Design
$25,000 to $100,000 est. value
Waldport, OR

Lookout Point Powerhouse Heat Pump Ventilation
Alteration
Design
$250,000 to $500,000 est. value
Lowell, OR 97452

Mcbride Elementary Heating, Ventilation, and Air Conditioning (HVAC) Improvements
Renovation
Sub-Bidding
$400,000 CJ est. value
Saint Helens, OR 97051

Columbia City School HVAC Renovations Project
Renovation
Sub-Bidding
$500,000 CJ est. value
Columbia City, OR 97018

Residential HVAC Contractors
Term Contract
Post-Bid
OR

Medford School District MSDEC Annex HVAC Upgrades
Renovation
Post-Bid
Medford, OR 97501

HVAC Filters, Installation and Coil Cleaning Services
Alteration
Results
$245,000 est. value
Hillsboro, OR

Pioneer Hall AC Replacement
Alteration
Results
$251,293 est. value
Bend, OR 97703

Classroom Climate / High Lakes Elementary - 2022 Bond - Bend-La Pine Schools
Renovation
Pending Verification
$20,189 CJ est. value
Bend, OR 97701

Classroom Climate/WE Miller Elementary- 2022 Bond - Bend-La Pine Schools
Renovation
Pending Verification
$367,666 CJ est. value
Bend, OR 97703

Harkins House HVAC Upgrade and Replacement
Renovation
Sub-Bidding
$1,000,000 CJ est. value
Hillsboro, OR 97123

Lake Oswego Library HVAC and Controls Upgrade
Alteration
Post-Bid
$140,000 to $180,000 est. value
Lake Oswego, OR 97034

Linn-Benton Community College Main Campus Takena Remodel Project
Alteration
Results
Albany, OR 97321

Classroom Climate / Kenwood Elementary - 2022 Bond - Bend-La Pine Schools
Renovation
Pending Verification
$197,862 CJ est. value
Bend, OR 97701

EOCI Boiler Deaerator Tank Replacement
Renovation
Sub-Bidding
$180,000 CJ est. value
Pendleton, OR 97801

Last Updated 02/06/2023 03:15 PM
Project Title

Monroe Middle School Boiler Upgrade

Physical Address View project details and contacts
City, State (County) Eugene, OR 97401   (Lane County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected February 2023
Bids Due View project details and contacts
Estimated Value $148,300 [brand] Estimate
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

For Monroe Middle School Boiler Upgrade Bidders are encouraged to send a test email to the email address above to ensure they have it correct and that we receive it accordingly. For purposed of receipt time, the sent timestamp from the bidders email account will be used and an email receipt confirmation will be sent to submitter. It is the responsibility of all Prime Bidders, Sub-bidders, and Suppliers to obtain Bidding Documents and all Addenda from the hyperlink. It is important that all bidders correctly indicate all addenda on the bid form. Each Bid must be submitted on the prescribed form and accompanied by an electronic copy of a Surety Bond, Cashiers Check, or Certified Check, executed in favor of Eugene School District 4J, in the amount not less than ten percent (10%) of the total bid, based upon the total bid amount for those items bid upon. Bidders are required to mail by USPS the original Surety Bonds, Cashiers Check or Certified Check and post marked within 3 hours after Bid Due Date. Mail to Facilities Management, Attention CIP, 715 West 4th Avenue, Eugene, Oregon 97402. Either with the Bid or within two working hours of the Deadline for Submission of Bids, bidders shall electronically submit, on the form provided, information regarding first-tier subcontractors furnishing labor or labor and materials, as provided in ORS 279C.370. Bids for which disclosure forms are required, but not submitted, will be rejected. No bid for a construction contract will be received or considered unless the Bidder is registered with the Construction Contractors Board or licensed by the State Landscape Contractors Board at the time the Bid is made, as required by OAR 137-049-0230. [A license to work with asbestos-containing materials under ORS 468A.720 is not required for this project.] For every bid $100,000 or greater, all Contractors and Subcontractors shall have a public works bond, in the amount of $30,000, filed with the Construction Contractors' Board (CCB), before starting work on the project, unless exempt. A copy of the Contractors BOLI Public Works Bond shall be provided with the executed contract documents. Each Bid shall contain a statement indicating whether the Bidder is a resident bidder, as defined in ORS 279A.120. Each Bid shall contain a statement that the Contractor agrees to be bound by and will comply with the provisions of ORS 279C.800 through 279C.870 regarding payment of Prevailing Wages. Contractor shall certify nondiscrimination in obtaining required subcontractors, in accordance with ORS 279A.110(4). School District 4J reserves the right to (1) reject any or all Bids not in compliance with all public bidding procedures and requirements, (2) postpone award of the Contract for a period not to exceed sixty (60) days from the date of bid opening, (3) waive informalities in the Bids, (4) select the Bid which appears to be in the best interest of the District, or (5) reject any or all bid

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents