Similar Projects
2022 Street Reconditioning Program
Infrastructure
Bidding
$500,000 est. value
Beaver Dam, WI

Asphalt, Asphalt Milling, and Overlay Projects 2022
Infrastructure
Bidding
$2,000,000 est. value
Horicon, WI

2021 Kansas Street - Street and Utility Improvements
Post-Bid
Horicon, WI 53032

2021 Street and Utility Improvements
Post-Bid
Mayville, WI

Airfield Paving Construction MATOC
Results
Less than $400,000,000 est. value

Portage - Fox Lake, STH 22 to 0.19 MI. W. of Morris Drive, Pardeeville - Manchester, CTH P to STH 33
Results
Fox Lake, Pardeeville, Portage, WI 53954

Cityview 2nd Addition - Phase 1
Infrastructure
Bidding
$500,000 est. value
Horicon, WI

Cold Mix Wedging & Hot Asphalt Seal Coating
Post-Bid
WI

2021 Asphalt Paving/Milling - South Street
Results
Lowell, WI 53557

2022 Street Maintenance Program
Infrastructure
Bidding
$300,000 est. value
Juneau, WI

Hot Mix, Preparing And Resurfacing; Wedging, Seal Coating, Shoulder Work And Other Road Repairs
Renovation
Post-Bid
WI

2021 Street Reconditioning Program
Results
$600,000 est. value
Beaver Dam, WI

2022 Dodge County HMA Paving Contract
Infrastructure
Bidding
$510,000 est. value
Juneau, WI

Hot Mix, Blacktop, Seal Coating, and Crack Filling
Post-Bid
WI

2021 Dodge County Justice Building Parking Lot Paving
Results
WI

Reported 07/13/2022 12:00 AM
Project Title

Asphalt Replacement John C. Burke Correctional Center

Physical Address View project details and contacts
City, State (County) Waupun, WI 53963   (Dodge County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Bidding, Construction Start Expected August 2022
Bids Due View project details and contacts
Estimated Value $20,000 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

saw cutting asphalt pavement, pulverize existing asphaltic32 pavement, shaping and compacting the base aggregate, placing pipe underdrain and33 endwall, and placing hot mix asphaltic pavement. Additional work includes pavement34 marking and site restoration.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents