Similar Projects
Tilleys Pizza House - Banquet Room
Addition
Conception
Beloit, WI 53511

South Milwaukee Development of 150 Apartments And A Restaurant Or Brewery
Renovation - 600,000 SF
Conception
$40,000,000 est. value
Burlington, WI 53105

The District
New Construction - 135,552 SF
Design
West Bend, WI 53090

Walker's Point Cafe
Addition - 333 SF
Design
$770,000 est. value
Milwaukee, WI 53204

Arlington - Columbus, STH 22 to Commerce Drive
Infrastructure
Bidding
$10,000,000 CJ est. value
Arlington, WI 53911

O.B. Sherry Park - 3457/3461/3465 Milwaukee Street Demolition and Site Restoration
Demolition, Infrastructure
Bidding
$30,000 est. value
Madison, WI 53714

Spring Harbor Dredging 2022
Infrastructure
Sub-Bidding
$742,800 CJ est. value
Madison, WI 53715

Fuel Storage Tank Demolition
Demolition, Infrastructure
Sub-Bidding
$53,000 CJ est. value
Wausau, WI 54401

Oak Brewing Company
New Construction
Post-Bid
West Allis, WI 53214

Chambers Hill Farm 1st Addition Roadway
Post-Bid
Suamico, WI

Campus Site Work
Infrastructure
Results
$350,000 est. value
Union Grove, WI 53182

Housing Site Development and Infrastructure
Infrastructure
Results
WI

13 Lot Single Family Sub Division
New Construction
Construction
Mequon, WI 53097

DQ Grill & Chill
New Construction - 2,860 SF
Construction
$750,000 to $1,250,000 est. value
Oconomowoc, WI 53066

Panera Bread (Brookfield)
New Construction - 3,555 SF
Pending Verification
$500,000 to $1,000,000 CJ est. value
Brookfield, WI 53005

Last Updated 08/05/2022 01:05 PM
Project Title

Caribou Coffee -8th Street / Wisconsin Rapids

Physical Address View project details and contacts
City, State (County) Wisconsin Rapids, WI 54494   (Wood County)
Category(s) Commercial, Heavy and Highway
Sub-Category(s) Food/Beverage Service, Site Development
Contracting Method Bids by Invitation
Project Status Obtained from a credible source, Awaiting verification, Construction start expected September 2022
Bids Due View project details and contacts
Estimated Value $100,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Plans call for the construction of a drive-through coffee shop. As of August 5, 2022 this project has obtained site plan approval and is pending building permits. Information regarding the selection of a general contractor has not been released. While a firm construction timeline has not yet been established, construction is expected to begin in the third quarter, 2022. *Project information, including timeline and contacts, has been obtained through public sources. The content management team continues to pursue additional details; however, the contact(s) listed have yet to disclose or confirm any information. Inquiries should be directed to the contact(s) listed.

Details

300 SF.
Division 03 - Concrete, Concrete Forming, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Entrances and Storefronts, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Acoustical Ceilings, Resilient Flooring, Painting, Exterior Painting, Interior Painting.
Division 10 - Specialties, Signage, Compartments and Cubicles, Toilet Compartments, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers.
Division 11 - Equipment, Refrigerated Display Equipment, Foodservice Equipment, Foodservice Storage Equipment, Refrigerated Food Storage Cases, Walk-In Coolers, Foodservice Shelving, Food Cooking Equipment, Food Dispensing Equipment, Soda Fountain Equipment, Ice Machines, Cleaning and Disposal Equipment.
Division 12 - Furnishings, Countertops, Furnishing Accessories, Waste Receptacles, Rugs and Mats, Entrance Floor Mats and Frames, Site Furnishings, Trash and Litter Receptacles.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers, Drinking Fountains.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Ventilation Hoods, Commercial-Kitchen Hoods.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Power Distribution Units, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting, Lighting Poles and Standards, Parking Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Audio-Video Communications.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection.
Division 31 - Earthwork, Site Clearing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Planting.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents