Similar Projects
Montessori Children's House of Denver
New Construction - 38,000 SF
Conception
$5,000,000 to $10,000,000 CJ est. value
Denver, CO

RiNo Art District
Renovation
Conception
Denver, CO 80205

Watershed
New Construction, Build-Out - 180,000 SF
Design
$72,000,000 est. value
Denver, CO 80216

Harvard Gulch West Trail (Elevate Denver Bond)
Design
Denver, CO

Furnish and Installation of Basketball Backstops with Removal of Existing Equipment
Post-Bid
Denver, CO 80202

Metzler Ranch Park Dugout Construction
Post-Bid
Castle Rock, CO 80104

Eastonville Regional Trail
Results
Colorado Springs, CO 80900

Harlow Park Improvements
Results
$850,000 to $890,000 est. value
Littleton, CO 80123

Design/Build Services for Tennis Courts
Construction
Colorado Springs, CO 80920

Heritage Park Restroom Renovation/Cleo Mudrock Baseball Dugout Roofing Project
Renovation
Construction
Less than $125,000 est. value
Louisville, CO 80027

Copper Steppe at Greeley Mall
New Construction
Design
$13,600,000 est. value
Greeley, CO 80634

Meadows Community Center Playground Replacement
Post-Bid
Colorado Springs, CO 80905

CO FLAP SUM 91(1), Fremont Pass Trail
Results
$3,000,000 to $5,000,000 est. value
Frisco, CO 80443

Parklane Pool and Bathhouse Improvements
Construction
$1,000,000 to $1,200,000 est. value
Aurora, CO 80111

Dry Lake Campground & Road Rehabilitation
Design
Steamboat Springs, CO

Last Updated 06/08/2020 10:13 AM
Project Title

Walter Byron Restroom & Playground Project

Physical Address View project details and contacts
City, State (County) Frisco, CO 80443   (Summit County)
Category(s) Entertainment/Recreation, Heavy and Highway
Sub-Category(s) Park/Playground, Restroom/Bath House
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The objective and ultimate goal for this project is the design and construction of a new, year-round restroom facility and playground area at Walter Byron Park. The existing restroom was built in 1992 and is approximately 500 square feet in size. It is comprised of four toilet stalls and standard fixtures. The existing play structure was installed in 2003 and consists of swings, slides, and climbing structures. The contractor will need to demolish and remove the existing restroom facility and play structure. The Town of Frisco requests that the contractor pursues donation or reuse of the play equipment. The new restroom facility will consist of a four stalls in two gender specific rooms with two-stalls per room, a mechanical chase and storage area, covered entrance, and outdoor water fountain. The new playground area will consist of an approximately 5,000 square foot play pit area surrounded by a 4’ wide concrete sidewalk and curb, with equipment to include climbing, swing, and slide features appropriate for children ages 2-10. Additional priorities for the project include: preserving the existing parking area, integrating the new restroom and playground areas into the existing parking lot, picnic pavilion, and pathways. It is expected that the contractor install fencing to allow the remainder of the park to remain open to the public during construction.

Details

Park/Playground, 5,000 SF New Construction.
Division 03 - Concrete, Concrete Forming and Accessories, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 09 - Finishes, Painting.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories.
Division 11 - Equipment, Play Field Equipment and Structures, Playground Equipment, Play Structures.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting, Interior Lighting, Exterior Lighting.
Division 31 - Earthwork, Selective Clearing, Grading.
Division 32 - Exterior Improvements, Athletic and Recreational Surfacing, Site Improvements, Fences and Gates, Planting.
Division 33 - Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents