Similar Projects
Emerson Avenue Improvements
Design
$27,631,381 est. value
Indianapolis, IN 46204

Street Paving
Infrastructure
Bidding
$220,000 est. value
Burlington, IN

County Road 17
Infrastructure
Bidding
Elkhart, IN

Marengo Industrial Park Roadway Engineering Services
Post-Bid
Marengo, IN 47140

Downtown Alley Repaving
Post-Bid
Bloomington, IN 47402

Concrete Pavement Restoration and Bridge Deck Overlay
Results
IN

Four Porter County Roadway - Project C
Results
Valparaiso, IN 46383

Crack Sealing and Bituminous Surface Treatment
Infrastructure
Bidding
Princeton, IN

Term Agreement for On-Call Pothole Patching Services Department of Public Works
Term Contract
Post-Bid
Indianapolis, IN

HMA and PCC Pavement Rehabilitation
Results
Indianapolis, IN 46204

ST-20-105 Concrete Pavement Rehabilitation - Area 3
Infrastructure
Bidding
$7,500,000 to $8,500,000 est. value
Indianapolis, IN

2020 CCMG Resurfacing
Post-Bid
Windfall City, IN

Hot-In-Place/Heater Scarification Asphalt Surface Recycling Improvements
Results
Less than $300,000 est. value
Cedar Lake, IN 46303

Concrete Street Repairs
Infrastructure
Bidding
Evansville, IN

2020 Resurfacing Drainage Improvements
Post-Bid
Sweetser, IN 46952

Reported 06/15/2021 12:00 AM
Project Title

Overlay on Existing Black Top

Physical Address View project details and contacts
City, State (County) Mount Vernon, IN 47620   (Posey County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

Overlay on existing Black Top contracts or bids with the county will Not be treated as accompanying these Blackford Rd. from Nation Rd. to Farmersville Rd. bids Blackford Rd. from Farmersville Rd. to Breeze Rd. The board reserves the right to reject Darnell School Rd. from Ford Rd. to Caborn Rd. Any or all Bids.Springfield Rd. from Record Rd. to Hwy 69 for 15,856’St. Wendel Rd. from Emge Rd. to Hwy 65 for 11,470’Lower New Harmony Rd. from Base Rd. to Ranes Rd.Lower Mt Vernon Rd. from West Franklin Rd. to End of Blacktop

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents