Similar Projects
General Contractors and Roofers Habitat For Humanity Of Broward
New Construction, Renovation
Bidding
FL

Plantation Police Department Tile Roof Replacement
Bidding
Plantation, FL 33317

Roofing Envelope Services
Post-Bid

Roof Coating of Florida Highway Patrol(Fhp)Troop K Building #4715 Lake Worth, Florida`S Turnpike Mainline(Sr 91), Milepost 94.0
Post-Bid
Greenacres, FL 33467

Roof Replacement of Various City Wide Buildings
Results
Less than $900,000 est. value
Pembroke Pines, FL

Roof Replacements for the Hazard Mitigation Grant
Results
Less than $728,520 est. value
Pembroke Pines, FL 33027

Roofing Repair and Maintenance
Post-Bid

AFICC Enterprise Wide Roofing Repair, Replacement, and Maintenance (R3M)
Results

Government Center East Annex Re-Roof and HVAC
Post-Bid
$1,250,000 to $1,425,000 est. value
Fort Lauderdale, FL 33301

Roofing Services
Term Contract
Results
Fort Lauderdale, FL 33309

Roof Replacement
Post-Bid
Hollywood, FL 33024

MATOC - Army Reserve National Roofing Program (NRP)
Results
Less than $95,000,000 est. value

Roof Replacement
Post-Bid
Hollywood, FL 33024

Hugh Taylor Birch State Park - Terramar Improvements
Results
Fort Lauderdale, FL 33304

Water Treatment Facility Building A Roof Replacement
Post-Bid
$75,000 est. value
Lauderhill, FL 33313

Last Updated 05/07/2021 11:57 AM
Project Title

Fuel Island Canopy

Physical Address View project details and contacts
City, State (County) Fort Lauderdale, FL   (Broward County)
Category(s) Single Trades
Sub-Category(s) Roofing
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $70,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The canopy shall be constructed to withstand the current wind rating according to the Broward County windspeed. Approximate dimensions 42 feet x 46 feet x 16 feet from finished grade to the bottom of the fascia. The finished roof shall be designed with an overhang to extend over the fueling equipment but not cover the fuel containment area, approximately four (4) feet. The canopy columns shall be designed to meet all load and wind requirement. The columns shall be treated and painted to provide superior protection against rust - Provide proposed treatment and paint warranty. City will be provided color options and select the desired color. The roof shall incorporate decking, soffit panels, fascia and gutters with a baked on finish. Provide warranty of product offered. City will be provided color options and select the desired colors. The canopy shall be designed to incorporate conduit and fixtures for LED lighting to provide sufficient lighting to the fuel equipment and the area under the canopy

Details

Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents