2022 Sidewalk Improvements Project
Infrastructure
Bidding
$308,000 CJ est. value
Lockhart, TX 78644

Construction of Hartland Ranch Phase 1 Wastewater Improvements
Infrastructure
Post-Bid
$400,000 CJ est. value
Lockhart, TX 78644

Waterstone Phase 2
New Construction, Infrastructure
Post-Bid
$500,000 CJ est. value
Maxwell, TX 78656

Fire Training Facility
New Construction, Infrastructure - 4,529 SF
Results
$2,777,777 CJ est. value
San Marcos, TX 78666

Phase 1B - Segment D Pipeline
Infrastructure
Results
$14,927,727 CJ est. value
Lockhart, TX 78644

Hershey Creamery Company Cold Storage Facility / Lockhart
New Construction, Infrastructure - 20,000 SF
Pending Verification
$11,000,000 CJ est. value
Lockhart, TX 78644

Borchert Loop Apartment / Lockhart
New Construction, Infrastructure
Pending Verification
$90,000,000 CJ est. value
Lockhart, TX 78644

Construction of Hartland Ranch Phase 1 Wastewater Improvements
Infrastructure
Post-Bid
$690,000 CJ est. value
Lockhart, TX 78644

Live Love Lockhart
Infrastructure
Results
$654,005 CJ est. value
Lockhart, TX 78644

Micron Technology Fabrication Plant / Project Evergreen
New Construction, Infrastructure
Pending Verification
$50,000,000 CJ est. value
Lockhart, TX 78644

White Water Express / Lockhart
New Construction, Infrastructure - 4,405 SF
Post-Bid
$1,700,000 CJ est. value
Lockhart, TX 78644

FM 671 - Bridge Replacement
Demolition, New Construction, Infrastructure
Results
$2,089,053 CJ est. value
Luling, TX 78648

Iron Ox Inc Food Processing Facility - Phase 2
New Construction, Infrastructure - 1,000,000 SF
Pending Verification
$120,000,000 CJ est. value
Lockhart, TX 78644

Bridge Replacement
Demolition, New Construction, Infrastructure
Results
$777,849 CJ est. value
Lockhart, TX 78644

Ziegenfelder Frozen Treat Company Manufacturing Facility / Lockhart
New Construction, Infrastructure - 42,000 SF
Pending Verification
$30,000,000 CJ est. value
Lockhart, TX 78644

Last Updated 02/08/2023 07:35 AM
Project Title

Water Treatment Plant High Service Pump Station Expansion

Physical Address View project details and contacts
City, State (County) Lockhart, TX 78644   (Caldwell County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Lift and Pump Stations, Sewage Treatment Plant, Site Development
Contracting Method Competitive Bids
Project Status Results, Construction start expected January 2023
Bids Due View project details and contacts
Estimated Value $989,000 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

The proposed water treatment plant improvements will consist of replacing the existing 600 GPM jockey pump with a 1,200 GPM constant speed pump, installation of (1) new 1,200 GPM pump on a variable frequency drive (VFD), and installation of (2) new generators to provide backup power to the Water Treatment Plant; and all other appurtenances necessary for the complete of project. Bidders shall submit with their bids a Cashier's Check in the amount of five percent (5%) of the maximum total bid, payable to the City of Lockhart, Texas without recourse, or a Bid Bond in the same amount from an approved Surety Company as a guarantee that Bidder will enter into a contract and execute performance and payment bonds on the forms provided, within ten (10) days after the award of Contract. Bids without check or Bid Bond will not be considered. The successful Bidder must furnish Performance and Payments Bonds each in the amount of 100% of the contract price from an approved Surety Company holding a permit from the State of Texas to act as Surety and acceptable according to the latest list of companies holding certificates of authority from the Secretary of Treasury of the United States, or other Surety or Sureties acceptable to the Owner. Please submit questions for this project forty-eight (48) hours prior to bid opening through website in the Q&A portal. All addenda issued for this project will be posted on website. It is the responsibility of the Contractor bidding to use proper scaling, paper size, etc., for bid quantities. Failure to do so may result in error in the Unit Bid Quantities and/or Bid Amounts. The City Council of the City of Lockhart reserves the right to reject any or all bids and to waive formalities. No bid may be withdrawn within ninety (90) days after the date on which bids are received The selected Respondent will be the general contractor for the Project, which is the construction of Water Treatment Plant High Service Pump Station Expansion. The City anticipates the following items will be included in the scope of the Project: replacing the existing 600 gpm jockey pump with a 1,200 gpm constant speed pump, installation of (1) new 1,200 gpm pump on a variable frequency drive (VFD), and installation of (2) new generators to provide backup power to the Water Treatment Plant; and all other appurtenances necessary for the complete Project. The Project will be designed and constructed so as to meet all applicable federal, state, and local accessibility standards. The selected Offeror may be required to perform some or all of the following pre-construction and construction services. Preconstruction Services may include, but not necessarily be limited to, planning and value engineering the Work. Construction Services may include, but not necessarily be limited to, all work associated with construction, occupancy and warranty of the facilities. The Work includes, but is not limited to: 1. Installation of two (2) new 1,200 gpm vertical turbine pumps. 2. Installation of two (2) new emergency generators. 3. Site piping. 4. Electrical. 5. Miscellaneous appurtenances necessary for the complete Project Estimated maximum construction budget is approximately $1,000,000.00. This includes all incidental and contingent expenses associated with the construction of the Project.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Metal Fabrications.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows, Hardware.
Division 09 - Finishes, Painting and Coating.
Division 10 - Specialties, Signage, Compartments and Cubicles, Toilet, Bath, and Laundry Accessories, Emergency Aid Specialties, Fire Protection Specialties, Fire Extinguishers, Storage Specialties, Storage Assemblies.
Division 11 - Equipment, Laboratory Equipment.
Division 12 - Furnishings.
Division 14 - Conveying Equipment, Scaffolding.
Division 21 - Fire Suppression, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Audio-Video Systems, Distributed Audio-Video Communications Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Access Control, Intrusion Detection, Electronic Surveillance, Electronic Detection and Alarm.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Water Utilities, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.
Division 40 - Process Integration, Water Process Piping.
Division 44 - Pollution and Waste Control Equipment, Common Work Results for Pollution and Waste Control Equipment, Air Pollution Control, Noise Pollution Control, Odor Control, Water Pollution Control Equipment, Solid Waste Control and Reuse, Waste Thermal Processing Equipment, Fluidized Bed Combustion Equipment, Rotary Kiln Incinerators, Pyrolysis Equipment, Hazardous Waste and Medical Waste Incinerators, Heat Recovery Equipment for Waste Thermal Processing, Synthesis Gas Cleanup and Handling Equipment.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents