Similar Projects
RFQ - United States Coast Guard (USCG) Disaster Reconstitution Multiple Award Construction Contract
Term Contract
Conception
$1,500,000 CJ est. value
Seattle, WA 98174

FY22 USACE Nashville District Design-Build and Design-Bid-Build Multiple Award Task Order Contract (MATOC)
Term Contract
Design
Nashville, TN 37219

University Services Campus Community Safe Room - Early Site Package
Infrastructure
Bidding
$2,912,000 CJ est. value
Tuscaloosa, AL 35401

RFQ Design - EHRM Training and Admin Space Support
Term Contract, Renovation, Infrastructure
Bidding
$1,535,800 CJ est. value
Tuscaloosa, AL 35404

Citizens Water Service - Water Main Extension
Infrastructure
Post-Bid
Vance, AL

Take 5 Car Wash / Tuscaloosa
New Construction, Infrastructure - 3,963 SF
Post-Bid
$900,000 CJ est. value
Tuscaloosa, AL 35404

Bryce Campus Utilities and Infrastructure
Results
$1,200,000 to $1,400,000 est. value
Tuscaloosa, AL

AMI 2021 Meter Change-Out Project Phase 1
Results
Tuscaloosa, AL

Crisstown Road Water Main Replacement
Infrastructure
Construction
$200,000 est. value
Tuscaloosa, AL

Water Main Relocation
Infrastructure
Construction
Northport, AL

Fit Foodz / Tuscaloosa
Addition, Renovation, Infrastructure
Pending Verification
$15,000,000 CJ est. value
Tuscaloosa, AL 35401

Northport Career Tech Annex Canopy Addition
Infrastructure
Post-Bid
$1,200,000 CJ est. value
Tuscaloosa, AL 35401

Clinical Services & Research MRI Addition - Early Foundation
Results
$950,000 est. value
Tuscaloosa, AL 35404

Peterson Water System - 2022 Water Main Replacements
Infrastructure
Post-Bid
$400,000 CJ est. value
Tuscaloosa, AL 35401

Rose Administration Watermain Replacement
Results
$140,000 est. value
Tuscaloosa, AL

Last Updated 08/12/2022 04:07 PM
Project Title

2022 Meter Change-Out Project, Phase 1

Physical Address View project details and contacts
City, State (County) Tuscaloosa, AL 35401   (Tuscaloosa County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Construction start expected February 2023
Bids Due View project details and contacts
Estimated Value $300,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

As of August 12, 2022, bids were rejected. No definite date for the rebid. Please contact the owner directly for post bid information. The Project shall be known as AMI 2021 Meter Change-Out Project Phase 1 and the general character of said public works project shall consist of the following: As coordinated between the City of Tuscaloosa and Contractor, Contractor shall, provide Technical, Labor and Data services to exchange/replace, retrofit existing water meters, with utility provided ( 1) water meters of same size and lay-length at assigned service locations including installation and programing ITRON 100W+ Water Pit Encoder with connectors. This installation shall be a through the lid. The approximate quantities of said Project are as follows: 1071 Each 5/8" water meters of same size and "lay-length" at assigned service locations. 349 Each 3/4" water meters of same size and "lay-length" at assigned service locations. 175 Each 1" water meters of same size and "lay-length" at assigned service locations. 150 Each utility provided meter boxes replaced on as-needed basis at the discretion of the utility. Special instructions are as follows: MBE/DBE/WBE Forms 1 & 2 are due to Caramyl Drake at cdrake@tuscaloosa.com no later than March 17th at 5:00 p.m.. Forms 3, 4, & 5 are due with your sealed bid. Bids not compliant with required forms will be deemed non-repsonsive. Please read the policy starting on page 102 carefully. The City will furnish the following: Water meters of same size and "lay-length" at assigned service locations, ITRON 100W+ Water Pit Encoders with connectors, meter boxes replaced on as-needed basis at the discretion of the utility. Time of Construction: From the date stated in the Notice to Proceed, the Project time of construction is 120 consecutive calendar days.

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents