Similar Projects
Upper Conduit Repair - Construction Phase 1 - Construction
Infrastructure
Bidding
$1,341,400 est. value
Salt Lake City, UT

Traverse Transmission Line Improvement Project
Infrastructure
Bidding
Draper, UT

1800 North Sewer Realignment
Post-Bid
Salt Lake City, UT 84116

Waste Water Sewer Cleaning and Maintenance
Term Contract
Post-Bid
Salt Lake City, UT 84114

2018 West Jordan Manhole Raising Project
Results
$161,900 est. value
West Jordan, UT

MP15 - 700 South Interceptor Capacity Upgrade and 700 South Water Main
Results
Less than $3,293,600 est. value
Salt Lake City, UT 84115

Drain Cleaning Services
Term Contract
Post-Bid
Draper, Ogden, Orem, Salt Lake City, West Valley City, UT 84020

7200 South Sanitary Sewer Project
Results
Less than $2,820,200 est. value
Midvale, UT 84047

99--Market Survey-Sewer Line Replacement at Oakland ARTCC, ZOA
Post-Bid
Salt Lake City, UT 84103

Sewer along Private Lane, Pinecrest Lane
Results
Less than $107,318 est. value
Sandy, UT 84092

Sewer along 12000 South East of Redwood Road
Post-Bid
Herriman, UT 84065

2020 Manhole Raising Project
Results
West Jordan, UT 84088

21G - Manhole Rehabilitation Project
Infrastructure
Post-Bid
$85,000 est. value
Salt Lake City, UT

SLCC TRC and MC Drain and Sump Replacements
Results
$127,000 est. value
Salt Lake City, UT 84129

Construction of the Redwood Road 2021 Improvements
Infrastructure
Post-Bid
Taylorsville, UT

Reported 09/23/2021 12:00 AM
Project Title

2021 Sewer Pipeline Project

Physical Address View project details and contacts
City, State (County) Kearns, UT   (Salt Lake County)
Category(s) Sewer and Water
Sub-Category(s) Sanitary Sewers
Contracting Method Competitive Bids.
Project Status Accepting Qualifications
Bids Due View project details and contacts
Estimated Value $1,800,000 to $2,000,000
Plans Available from Municipal Agency - 09/08/21
Owner View project details and contacts
Architect View project details and contacts
Description

Work, located at located at 5350 West 5400 South, Kearns, UT 84118. General Contractors interested in bidding on the Kearns Improvement District 2021 Zone E Sewer Pipeline Project. General Contractors to bid the construction of the 2021 Zone E Sewer Pipeline Project. Work Schedule A (Outfall Zone E Sewer) includes constructing approximately 4,500 feet of 15inch diameter SDR35 PVC pipe and 112 LF 24” Bore and Casing under UT111. Site of Work: Mountain View Corridor to UT111 from 6600 South to 7000 South, Kearns, UT (includes parts of unincorporated Salt Lake County, West Jordan City, and West Valley City).

Details

Division 03 - Concrete, Precast Concrete.
Division 33 - Utilities, Sanitary Sewerage Utilities, Sanitary Utility Sewerage Piping, Sanitary Utility Sewerage Force Mains, Sanitary Utility Sewerage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents