Similar Projects
Pumping Station 4 Rehabilitation
Post-Bid
Madison, WI

Sewer Cleaning and Multi Sensor Inspection for the Pumping Station 16 Force Main
Post-Bid
Madison, WI

East Side Interceptor and MMSD PS 17 Force Main Relief Phase I
Results
Less than $8,800,000 est. value
Verona, WI

Nine Springs Valley Interceptor Improvements - McKee Road to Dunn`s Marsh
Results
Fitchburg, Madison, WI 53719

Sanitary Services
Infrastructure
Post-Bid
Madison, WI

CIPP Rehab of Sanitary Sewers
Results
$1,141,590 est. value
Madison, WI 53703

Northeast Interceptor Joint Grouting MH10-106 to MH10-101
Infrastructure
Post-Bid
Madison, WI

Sanitary Sewer Lining Replacement
Results
Less than $140,000 est. value
Madison, WI 53704

Dunning Street, Jackson Street and Lafollette Avenue Reconstruction Assessment District - 2020
Results
Less than $4,034,805 est. value
Madison, WI 53704

Tiedeman Pond Lift Station Upgrades
Results
$600,000 est. value
Middleton, WI

West Interceptor Shorewood Relief Phase 1
Results
$5,400,000 est. value
Madison, WI

2021 East Side Sewer Extension
Results
McFarland, WI

Rockstream Drive Assesssment District - 2020
Results
Less than $2,136,420 est. value
Madison, WI 53719

Cedar Street Assessment District - 2021 And South Street, High Street, And West Wingra Drive Assessment District - 2021
Renovation
Results
$4,348,305 est. value
Madison, WI 53715

2021 CTH MN/Broadhead Street Utility and Street Improvements
Results
McFarland, WI 53558

Reported 10/06/2021 12:00 AM
Project Title

Pump Station 17 Rehabilitation and Force Main Relief Phase 2

Physical Address View project details and contacts
City, State (County) Verona, WI   (Dane County)
Category(s) Sewer and Water
Sub-Category(s) Lift and Pump Stations, Sanitary Sewers
Contracting Method Competitive Bids.
Project Status Request for Proposals (RFPs)
Bids Due View project details and contacts
Estimated Value
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

The “Pumping Station 17 Rehabilitation” portion will upgrade MMSD’s facilities in advance the significant increase in anticipated flows to the station. The rehabilitation will include improvements such as: new pumps and associated piping, electrical improvements to support the new pumping equipment, a new standby generator, replacement of HVAC equipment, and replacement and automation of station valves. The “Force main Relief Phase 2” portion will complete the relief force main and provide additional conveyance capacity. Phase 1 was completed in 2021 and installed approximately 6,955 feet of force main and Phase 2 will install the remaining length of pipe needed, which may be as much as 9,800 feet in a combination of force main and/or gravity interceptor. This could potentially involve connecting and directing flows to a portion of the downstream existing force main

Details

Lift and Pump Stations, Renovation.
Division 03 - Concrete, Precast Concrete.
Division 04 - Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection.
Division 08 - Openings.
Division 09 - Finishes.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Extinguishers, Storage Specialties.
Division 11 - Equipment.
Division 12 - Furnishings.
Division 14 - Conveying Equipment, Scaffolding.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.
Division 27 - Communications, Data Communications, Voice Communications, Audio-Video Systems.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork.
Division 32 - Exterior Improvements, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Water Utility Distribution Equipment, Water Utility Pumping Stations, Sanitary Sewerage Utilities, Sanitary Utility Sewerage Piping, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains, Sanitary Utility Sewerage Structures.
Division 40 - Process Integration, Water Process Piping.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents