Similar Projects
Smithville Road Culvert Replacement - BR-2017-009H - County of Peoria
Infrastructure
Conception
$300,000 CJ est. value
Mapleton, IL 61547

Voorhees Road Bridge Replacement - BR-2018-009H - County of Peoria
Demolition, New Construction, Infrastructure
Conception
$300,000 CJ est. value
Edwards, IL 61528

New Restroom and Site Work W. H. Sommer Park
New Construction, Infrastructure
Design
$251,000 CJ est. value
Edwards, IL 61528

USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Post-Bid
$25,000,000 CJ est. value
Seattle, WA 98174

USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Post-Bid
$25,000,000 CJ est. value
Seattle, WA 98174

Construction of Rock Island Trail Extension
Results
Peoria, IL 61603

Seal-Coating Contract 2021
Infrastructure
Results
Peoria, IL

Lower Veteran's Park - Pickleball Courts
Infrastructure
Construction
$418,570 CJ est. value
Peoria, IL 61602

Lower Veteran's Park - Pickleball Courts
Infrastructure
Construction
$418,570 CJ est. value
Peoria, IL 61602

County Road 201 Remodel and Technology Upgrade - CH-19-003 - County of Peoria
Infrastructure
Conception
$350,000 CJ est. value
Peoria, IL 61603

Sidewalk Participation Program 2021
Infrastructure
Post-Bid
Peoria, IL

High Quality Aggregate Polymer Modified Slurry Seal Contract - 2021
Alteration
Results
Peoria, IL

Cottonwood Road Culvert Replacement - BR-2020-002H - County of Peoria
Infrastructure
Conception
$300,000 CJ est. value
Logan Township, IL 61536

DNR Jubilee Campground Road Repair
Infrastructure
Post-Bid
Brimfield, IL 61517

Bituminous Surface Treatment
Infrastructure
Results
Glasford, IL

Last Updated 01/23/2023 11:02 PM
Project Title

PCC Pavement Reconstruction, PCC Shoulders, Curb and Gutter, Storm Sewer Replacement, Traffic Signal Installation and Lighting

Physical Address View project details and contacts
City, State (County) Medina Township, IL 61523   (Peoria County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Maintenance, Paving/Reconstruction, Sidewalks/Parking Lot, Site Development, Water Lines
Contracting Method Bids by Invitation, Competitive Bids
Project Status Results, Request for Qualifications, Construction start expected February 2023
Bids Due View project details and contacts
Estimated Value $4,982,316 [brand] Estimate
Plans Available from State Agency
Owner View project details and contacts
Architect View project details and contacts
Description

PCC pavement reconstruction, PCC Shoulders, curb and gutter, storm sewer replacement, traffic signal installation and lighting on Old Galena Road from IL 29 north to Neal Lane with a 0.26 mile omission north of IL 29 to south of Engine Drive. Region 3 District 4 Federal Project # E750(768) County(s) Peoria Key Route(s) FAS 384 FAS 1387A Marked Route(s) OLD GALENA ROAD Section(s) 16-00058-10-PV State Job #(s) C-94-022-22 PPS #(s) 4-10649-0000 Completion Date: 110 Working Days Questions not accepted as of January 10, 2023 04:30 PM. Questions directed to: IDOT Contracts Office Harry R. Hanley Building Room 326 2300 South Dirksen Parkway Springfield, IL 62764 (217) 782-7806 Fax: (217) 785-1141 TDD: (217) 524-4875 DOT.DE-Contracts@illinois.gov Unless otherwise indicated, a proposal guaranty is required by bid bonds, cashier's check or properly certified check for not less than 5 (five) percent of the bid amount. If the proposal is accepted and the bidder is declared "not responsive," it is hereby agreed that the amount of the proposal guaranty will become the property of the State of Illinois and shall be considered as payment of damages due to the delay and other causes suffered by the State because of the failure to adhere to the procedures required. Otherwise, the bid bond will become void or the proposal guaranty check will be returned to the bidder. Contractors who desire to become prequalified or to renew their prequalification for this letting must file with the Department of Transportation, Bureau of Construction, Room 322, 2300 South Dirksen Parkway, Springfield, Illinois 62764, a Contractor's Statement of Experience and Financial Condition no later than 4:30 PM prevailing local time, December 30, 2022. A contractor will not be prequalified for this letting unless the statement is received before the time and day established. The Department reserves the right to reject any and all bids, to waive minor or immaterial irregularities, informalities or technicalities, to advertise for new bids, or to request confirmation or clarification from any bidder regarding a bid. ILDOT - 136 - PCC Pavement Reconstruction, PCC Shoulders, Curb and Gutter, Storm Sewer Replacement, Traffic Signal Installation and Lighting

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents