Similar Projects
Heart of Warrior Trail West Extension
Infrastructure
Bidding
$77,000 CJ est. value
Waukee, IA 50263

Harrison County Courthouse Exterior Rehabilitation Project
Infrastructure, Renovation
Bidding
$760,000 CJ est. value
Logan, IA 51546

2022/23 Pavement Restoration - Slurry Seal Program
Infrastructure
Sub-Bidding
$211,072 CJ est. value
Ames, IA 50010

Electric Vehicle Charging Station Installation
Term Contract
Post-Bid
Less than $25,000 est. value
Ames, IA 50010

Concrete Vaults
Alteration
Post-Bid
Ames, IA

Community Health Care Dental Clinic Basement Seepage Mitigation
Renovation, Alteration
Results
Davenport, IA 52801

Install Concrete Floor at PD Range Pole Building
Addition, Alteration
Results
Cedar Rapids, IA

Ballfield Improvements
Infrastructure
Bidding
$600,000 CJ est. value
Story City, IA 50248

Sterile Processing Services Addition and NFS Dock Renovations project at the VA Central Iowa Health Care System
Addition, Demolition, Renovation, Infrastructure - 13,955 SF
Post-Bid
$20,000,000 CJ est. value
Des Moines, IA 50310

Radio Tower Concrete Pads
Alteration
Results
Sac City, IA

NICC Peosta - South Parking Lot Reconstruction
Infrastructure
Bidding
$1,000,000 CJ est. value
Peosta, IA 52068

Centerville Academic Building - Architectural Precast Concrete Panels
Alteration
Post-Bid
Centerville, IA 52544

Pocahontas County Drainage District No. 56 Main 2 Tile Improvements
Alteration
Results
$530,000 est. value
Rolfe, IA

McCombs Middle School Restroom Upgrades
Renovation
Bidding
$400,000 CJ est. value
Des Moines, IA 50320

Mystique Ice Rink Concrete Subfloor Project
Renovation, Alteration
Post-Bid
$60,000 est. value
Dubuque, IA 52001

Last Updated 02/04/2023 04:28 AM
Project Title

SW State Street Fiber Optic Relocation

Physical Address View project details and contacts
City, State (County) Ankeny, IA 50021   (Polk County)
Category(s) Single Trades
Sub-Category(s) Concrete
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected March 2023
Bids Due View project details and contacts
Estimated Value $248,876 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

SW State Street - SW Oralabor Road to SW Prairie Trail Parkway Est. Completion Date: Nov. 3, 2023 The SW State Street Fiber Optic Relocation includes fiber optic cable and conduit modifications, and installation of traffic signal components at the intersection of SW State Street and SW Oralabor Road. The project includes installing approximately 22,500 LF of single-mode fiber optic cable and 6,700 LF of conduit, with approximately 310 fiber optic cable splices/ terminations and 5 splice enclosures/ cases. Other associated improvements include installation of traffic signal cabinet with riser and foundation, power service and handholes, temporary traffic control, mobilization, site restoration and miscellaneous associated work necessary to complete the project. The City will furnish approximately 5,000 LF of 24-count and 12,500 LF of 96-count single-mode fiber optic cable for Contractor installation in City-owned conduit. The Contractor will furnish approximately 3,000 LF of 48-count and 2,100 LF of 96-count single-mode fiber optic cable for installation in Ankeny Community School District (School)-owned conduit. The City will furnish the low-voltage ATC traffic signal cabinet, ATC controller, conflict monitor, uninterruptible power supply, and riser for Contractor installation. Communication Facilities/Network, Directional Bore, Fiber Optics, Directional Drilling, Conduit/Electrical/Telemetry, Bored Conduit, Revised Signal System, Traffic Control Signal Systems, Traffic Control Devices (Signals, Signing, etc.)

Details

Division 03 - Concrete, Cast-in-Place Concrete.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents