Similar Projects
Ignite Sports Complex
New Construction - 350,000 SF
Design
$13,000,000 est. value
Southington, CT 06489

All Sports Village
New Construction
Construction
$175,000,000 est. value
Windsor Locks, CT

Site Athletic Facility (Field) Improvements Hartford Public High School
Results
$941,000 est. value
Hartford, CT 06105

West Rocks Middle School Proposed Soccer Field Complex
New Construction
Results
$1,461,631 to $2,497,087 est. value
Norwalk, CT 06851

Ymca
New Construction
Conception
$15,000,000 to $40,000,000 est. value
Hamden, CT

Veterans Rally Point
New Construction - 18,000 SF
Conception
$2,500,000 est. value
Norwich, CT 06360

Glastonbury High School Athletics Facility
Post-Bid
Glastonbury, CT 06033

Athletic Training Facility
New Construction - 35,000 SF
Design
$1,000,000 to $5,000,000 CJ est. value
West Haven, CT 06516

Veterans Memorial Park Building Renovation
Renovation
Post-Bid
West Haven, CT 06516

Construction of Press Box at Dedrick Field
Post-Bid
Waterford, CT 06385

Reported 02/16/2021 12:00 AM
Project Title

UConn Hockey Arena / I-Lot Improvements

Physical Address View project details and contacts
City, State (County) Storrs, CT 06269   (Tolland County)
Category(s) Entertainment/Recreation
Sub-Category(s) Athletic Facility
Contracting Method Competitive Bids.
Project Status Sub-Bidding
Bids Due View project details and contacts
Estimated Value $53,000,000
Plans Available from Construction Manager
Owner View project details and contacts
Architect View project details and contacts
Description

The project includes a new three level, approximately 97,000 sf ice hockey arena to meet NCAA Division 1 requirements. This facility includes a 2,500 capacity fixed and bench seating arena, club level seating, ice rink, concession areas, bathrooms, team rooms, lockers, and strength and conditioning areas. The major structural system is a braced frame steel assembly with concrete slab on metal deck, and precast risers at the arena seating area. The structural roof system over the arena is long span joists. The exterior envelope includes curtainwall, brick veneer, and composite metal panel components. This project also includes extensive improvement to the I-Lot adjacent to the new rink, including new pavement, curbs, sidewalks, and miscellaneous site furnishings, and landscaping to support the new facility.

Details

1 Athletic Facility, to 97,700 SF New Construction Building, 12.50 Acres.
Division 01 - General Requirements, Construction Facilities.
Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Forming and Accessories, Concrete Forming, Concrete Accessories, Concrete Reinforcing, Cast-in-Place Concrete, Concrete Finishing, Precast Concrete, Cast Decks and Underlayment, Concrete Cutting and Boring.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Structural Steel Framing, Decorative Metal.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Metal Doors and Frames, Specialty Doors and Frames, Coiling Doors and Grilles, Entrances, Storefronts, and Curtain Walls, Windows, Hardware.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Flooring, Painting and Coating, Painting, Special Coatings.
Division 10 - Specialties, Signage, Partitions, Toilet, Bath, and Laundry Accessories, Safety Specialties, Lockers, Flagpoles.
Division 11 - Equipment, Vehicle and Pedestrian Equipment, Parking Control Equipment, Pedestrian Control Equipment, Commercial Laundry and Dry Cleaning Equipment, Unit Kitchens, Office Equipment, Foodservice Equipment, Audio-Visual Equipment, Athletic and Recreational Equipment, Athletic Equipment, Interior Scoreboards, Play Field Equipment and Structures, Playground Equipment, Play Structures, Athletic Field Equipment, Exterior Scoreboards, Therapy Equipment.
Division 12 - Furnishings, Multiple Seating, Fixed Audience Seating, Stadium and Arena Seating.
Division 13 - Special Construction, Special Activity Rooms, Athletic Rooms, Athletic and Recreational Special Construction, Fabricated Engineered Structures.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Facility Lightning Protection, Interior Lighting, Exterior Lighting, Lighting Poles and Standards, Exterior Athletic Lighting.
Division 27 - Communications, Audio-Video Communications.
Division 31 - Earthwork, Site Clearing, Selective Clearing, Earth Moving, Grading, Earthwork Methods, Special Foundations and Load-Bearing Elements.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Athletic and Recreational Surfacing, Site Improvements, Fences and Gates, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents