Similar Projects
Smithbridge Rd. Corridor(L)
Infrastructure
Conception
$2,895,000 CJ est. value
Chadds Ford, PA 19317

SR 1001 over Tributary to Susquehanna River
Demolition, New Construction, Infrastructure
Conception
$675,000 CJ est. value
Scott, PA 17815

Marshall Rd o/ Cobbs Creek
Infrastructure, Renovation
Design
$12,440,000 CJ est. value
Upper Darby, PA 19082

State Rd o/Darby Creek
Infrastructure, Renovation
Design
$9,020,000 CJ est. value
Media, PA 19063

RFP Design - Comprehensive Plan Update and Parks Recreation and Open Space Plan Development and Shaffer Park Design
New Construction, Infrastructure
Bidding
$300,000 CJ est. value
Bethel Township, PA 19060

Observatory Park Recreational Improvements
Infrastructure
Post-Bid
$500,000 CJ est. value
Darby, PA 19023

High Street Sewer Replacement
Infrastructure
Post-Bid
$167,750 CJ est. value
Sharon Hill, PA 19079

Newtown Township Line Restoration Projects
Infrastructure
Results
$53,026 CJ est. value
Newtown Square, PA 19073

MacDade Boulevard/I-476 Ridley Township Ramp Improvements
Infrastructure
Results
$16,238,555 CJ est. value
Folsom, PA 19033

Residence Inn by Marriott Hotel / Newtown Square
New Construction, Infrastructure - 26,613 SF
Pending Verification
$8,000,000 CJ est. value
Newtown Square, PA 19073

Estates at Coventry Woods Phase 2A
New Construction, Infrastructure
Pending Verification
$10,500,000 CJ est. value
Springfield, PA 19064

US 22/322 PM
Infrastructure
Conception
$2,850,000 CJ est. value
West Hanover, PA 17112

Folcroft Avenue O/AMTRAK
Demolition, Infrastructure
Design
$2,318,000 CJ est. value
Media, PA 19063

Muhlenberg Avenue Culvert Replacement Rebid
Infrastructure
Post-Bid
$93,023 CJ est. value
Ridley Township, PA 19081

King of Prussia Road (S.R. 1021) and Eagle Road (S.R. 1042) Intersection Improvements Project
Infrastructure
Results
$1,444,444 CJ est. value
Radnor, PA 19087

Last Updated 07/13/2023 02:03 PM
Project Title

Domestic Water Softener at G. W. Hill Correctional Facility

Physical Address View project details and contacts
City, State (County) Thornbury Township, PA 19319   (Delaware County)
Category(s) Government/Public, Heavy and Highway
Sub-Category(s) Prison/Jail, Site Development
Contracting Method Competitive Bids
Project Status Results, Construction start expected August 2023
Bids Due View project details and contacts
Estimated Value $95,790 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

Domestic Water Softner at G.w. Hill Correctional Facility Bid Bond or Certified Check (10% of Bid Amount). 3. Contractor Responsibility Certification (page 1 thru page 4). Copy attached. 4. Written statement describing his Apprentice Training Program and Affirmative Action Program. 5. Contractor s Qualification Statement (AIA Document A305). A performance bond and a labor and materials bond in the amount of one hundred percent (100%) of the total amount bid, and a maintenance bond must be submitted by the successful bidder within ten (10) days from the bid award date. C-2Section C Proposal Form IF AND WHERE DIRECTED BID Item No.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Forming, Concrete Reinforcing, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry, Concrete Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Metal Fabrications, Metal Specialties, Detention Enclosures.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Access Doors and Panels, Special Function Doors, Security Doors and Frames, Security Gates, Detention Doors and Frames, Windows, Special Function Windows, Detention Windows, Detention Window Screens, Hardware, Glazing.
Division 09 - Finishes, Flooring, Painting and Coating, Special Coatings, Concrete and Masonry Coatings.
Division 10 - Specialties, Signage, Lockers, Flagpoles, Security Mirrors and Domes.
Division 11 - Equipment, Loading Dock Equipment, Detention Equipment, Detention Pass-Through Doors, Detention Gun Lockers, Foodservice Equipment.
Division 12 - Furnishings, Detention Furniture.
Division 13 - Special Construction, Special Purpose Rooms.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems, Water-Based Fire-Suppression Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Facility Sanitary Sewerage, Plumbing Equipment, Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting, Interior Lighting, Emergency Lighting, Special Purpose Lighting, Detention Lighting, Exterior Lighting.
Division 27 - Communications, Data Communications, Voice Communications, Audio-Video Communications, Audio-Video Systems, Electronic Digital Systems, Public Information Systems, Distributed Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Access Control, Intrusion Detection, Electronic Surveillance, Video Surveillance, Electronic Detection and Alarm, Fire Detection and Alarm.
Division 31 - Earthwork, Earth Moving, Grading, Excavation and Fill, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Planting, Turf and Grasses.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents