Similar Projects
Utilities - SH 132
Infrastructure
Design
$500,000 est. value

Demolition of 121 North Main Street
Demolition, Renovation, Infrastructure
Design
$150,000 CJ est. value
Seminole, OK 74868

USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Bidding
$25,000,000 CJ est. value
Seattle, WA 98174

Wewoka Water Treatment Plant
New Construction, Infrastructure
Bidding
$16,000,000 CJ est. value
Wewoka, OK 74884

Power Line Right-of-Way Clearing
Term Contract
Post-Bid
Seminole, OK

Utility Relocation Gate Valves
Infrastructure
Post-Bid

Pavement Rehabilitation - SH 99
Infrastructure
Design
$1,400,000 CJ est. value
Seminole, OK 74868

Remove Existing Light Poles and Lights From 1 (One) Softball Field and Install Light Poles and Lights on 4 (Four) Softball Fields
Infrastructure
Post-Bid
$25,000 CJ est. value
Seminole, OK 74868

Install an Irrigation System
Infrastructure
Post-Bid
$585,000 CJ est. value
Seminole, OK 74868

Grade, Drain, Surface, and Bridge - US-270
Infrastructure
Post-Bid
$11,500,000 CJ est. value
Seminole, OK 74868

Grade, Drain, Surface, and Bridge - US-270
Infrastructure
Post-Bid
$30,000,000 CJ est. value
Seminole, OK 74868

Engineered Fill
Infrastructure
Post-Bid
$50,000 CJ est. value
Seminole, OK 74868

Wewoka Public Works Authority Water Treatment Plant Improvements - Contractor Prequalification
Renovation, Infrastructure
Post-Bid
$15,000,000 CJ est. value
Wewoka, OK 74884

Last Updated 02/13/2023 12:34 AM
Project Title

SH-99 - Utilities

Physical Address View project details and contacts
City, State (County) Seminole, OK 74868   (Seminole County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Construction start expected May 2023 , Construction documents
Bids Due View project details and contacts
Estimated Value $950,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

SH-99: From 3.05 Mi South of Us-270, South 8.0 Mi (New Parallel Lanes & Resurface Existing Lanes) (Ut for 23289(04)(13) As of February 13, 2023, the project is in Final Planning status. Anticipated letting month/year is January, 2023. Length :8.000 Mi OKDOT - SH-99 - Utilities *Project information has been obtained through a public state transportation improvement plan (STIP). A STIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the STIP often evolves based on funding availability. The project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents