Similar Projects
Last Updated | 07/23/2023 11:01 AM |
Project Title | Upgrade Lighting Controls and Fixtures Andersen Building |
Physical Address | View project details and contacts |
City, State (County) | Saint Paul, MN 55101 (Ramsey County) |
Category(s) | Government/Public |
Sub-Category(s) | Misc. Buildings |
Contracting Method | Competitive Bids |
Project Status | Bidding, Construction start expected September 2023 |
Bids Due | View project details and contacts |
Estimated Value | $2,595,450 [brand] Estimate |
Plans Available from | Electrical Engineer |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Site Directions: 540 Cedar St. St. Paul, MN 55101 State Project Number 02AS0034 Upgrade Lighting Controls and Fixtures Andersen Building A. The work will be done under one prime contract that includes: General, Mechanical, and Electrical construction. B. The following summary is a general guide to the scope of work. It should not be construed as a detailed list of work included in the contract. 1. Upgrade all existing light fixtures in the facility to LEDs, unless specifically noted otherwise. Upgrade work will include replacement of existing fluorescent fixtures with new LED fixtures, retrofitting existing fluorescent fixtures with new LED retrofit kits, or replacing existing fluorescent lamps with new LED Lamps. Refer to Drawings for additional requirements. 2. Upgrade existing controls to new Crestron Integrated Lighting control system. Provide new Crestron lighting control system, including but not limited to relay panels, switching panels, modules, sensors, power packs, wall switches, cabling, conduits, etc. as required. All system components shall be Crestron. New lighting control system shall be integrated into existing Honeywell EBI system at Capitol Complex. 3. Remove existing lighting control system, including relay panels in electrical rooms, devices such as vacancy sensors, occupancy sensors, daylight sensors, wall sensors, wall switches, override switches, wiring, cabling, etc. from the facility. No existing lighting control component may be abandoned in place unless explicitly noted by Engineer/Architect. Question Deadline 07/19/2023 at 2:00 PM CT The State is not obligated to answer questions submitted after the question due date and time. |
||||||||||||||||||||||||||||||||
Details | 9 Stories Above Grade, 410,374 SF.
|
||||||||||||||||||||||||||||||||
Bidder's List | View project details and contacts | ||||||||||||||||||||||||||||||||
Prospective Bidders | View project details and contacts | ||||||||||||||||||||||||||||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |