Similar Projects
External Tank Inspection - Air Force Academy Colorado
Bidding
CO

Magnesium Chloride Tanks - Kersey & Greeley
Bidding
CO

12K Tanks
Post-Bid
CO

21 K Fiber Glass Tanks
Post-Bid
CO

Miscellaneous Pipe Coating and Tank Repair 2019
Results
Less than $150,000 est. value
Loveland, CO

3rd Party Natural Gas Services
Results
Grand Junction, CO

CTF CDOC Fuel Tank Repairs BP1 DQ1 CMS163766
Bidding
$100,000 est. value
Denver, CO

Stock Water Pipeline and Bottomless Tanks
Post-Bid
Sterling, CO 80751

Catamount Ranch Water Tank Improvement
Results
Steamboat Springs, CO

Central Platte Campus CNG Feuling Complex Maintenance and Repair Services
Term Contract
Post-Bid
Denver, CO 80223

Aspen Maintenance Facility Phase 9 Fuel Tank Replacement
Results
Aspen, CO 81611

Cde Ten Well Plugging Project
Post-Bid
Denver, CO

Fuel Island Expansion for LPG Autogas
Results
Thornton, CO 80240

Romo Temporary Fuel Tank Hookup
Post-Bid
Estes Park, CO 80517

Livermore Fuel Site Tank Relocation
Results
$100,000 to $150,000 est. value
Livermore, CO 80521

Last Updated 03/05/2020 04:42 PM
Project Title

Put Hill Finish Water Storage Tank

Physical Address View project details and contacts
City, State (County) Pagosa Springs, CO   (Archuleta County)
Category(s) Sewer and Water
Sub-Category(s) Fuel/Chemical Tanks and Lines
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The work generally includes, but may not be limited to the following components: 1. Remove the existing Put Hill 100,000 gallon welded steel water storage tank. 2. Install an approximately 200,000 gallon welded steel water storage tank. a. Provide all engineered drawings for the tank i. Tank shall meet all OSHA requirements ii. Tank shall meet all CDPHE requirements iii. Tank shall be designed and constructed per AWWA S100 iv. Tank shall be painted per AWWA D102 v. Tank shall be disinfected per AWWA C652 b. Provide geotechnical engineering for the tank base

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Reinforcing, Cast-in-Place Concrete.
Division 05 - Metals, Structural Metal Framing, Metal Decking.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Facility Fuel Piping, Facility Fuel-Storage Tanks.
Division 31 - Earthwork, Clearing and Grubbing, Grading.
Division 32 - Exterior Improvements, Fences and Gates.
Division 33 - Utilities, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents